
- 11 -
3.
Project layout. Ensure the whole construction process of power equipment, batteries and
other reasonable layout.
4.
Wiring layout. Ensure that the wiring reasonable, orderly; and consider the moisture-proof,
corrosion prevention.
5.
The whole installation process should wear anti-static wristband.
6.
The installation site should be at least two or more people to operate.
CAUTION
:
Please ensure the installation site safe before installation.
→
Step1.
Use something as the rack to mark the position of the 9 holes, Then drill 10 mm
holes and make sure the depth of the holes is deeper than 80mm.
Caution
:
Single battery module is about 90kg. If without handling tools must have
more than 3 men to carry it.