background image

3

WWW.MORTUARYLIFT.COM

STATIONARY

INSTALLATION

on a Wood

Joist Ceiling

This machine

will lift itself to the

ceiling as shown

& described below.

1.  Locate ceiling joists and pre-drill six 1/4” holes

  (depending on your joist spacing) for 3/8” lag screws

  approximately 2” deep on 16” centers.

2.  Place 6 large eye lag bolts 6” outside the previously pre- 

 

  drilled lag screw holes as shown.

3.  While the machine is still on the ground, plug the machine

  in and unwind straps until fully extended.

4.  Flip the machine so that the motor and components are

  touching the floor.

5.  Connect extended straps to eye bolts and lift the hoist to

  the ceiling by pressing the up button on the remote or

  pendant (this keeps the hooks on the machine from

  jamming or catching in the machine spools while lifting).

  Be sure the straps wind up level on the spools.

6.  In securing the hoist to the ceiling it is very important to

  keep the frame level and not to conform to the irregularities

  of the ceiling.

Reviews: