morse 400A-72SS-110 Operator'S Manual Download Page 5

The Specialist In Drum Handling Equipment

Model 400A-72SS-110

Stainless Steel Hydra-Lift, 72”,  

AC Power Lift & Tilt

operator’s Manual for Morse Hydra-Lift Karrier Model 400A-72SS-110

Serial number 0512 to ____ (MMYY)

morsedrum.com

Copyright 2019 - Morse Mfg. Co., Inc. 

Form OM400A-72SS-110 (0512-____)  

(Updated 12 Jun, 2019 11:39 AM)

 

5

CAUTION

 

– Do not Transport with Drum Raised

ALWAYS LOWER THE DRUM HOLDER TO LOWEST POSITION BEFORE TRANSPORTING. 

 The 

unit can become unstable when transporting with a raised load.

5.) Lift drum to desired pouring height.  Operate the tilt control as described in 

“Machine Description - Controls”

 (page 3) 

to adjust the drum attitude. This is especially important when lifting an open drum.  The floor lock should be engaged while 

dispensing / draining.

6.) When dispensing is complete, tilt drum back to upright position.  Disengage the floor lock and lower the drum to transport

-

ing height; about 6” off the floor.

WARNING

 - Stay Clear of Raised Drum

NEVER allow anyone to be below any part of a raised drum handler or drum.  Remain behind the 

push handle while handling a drum.

WARNING

 – Do NOT Disengage the Cinch Chain When Drum is off the Ground

When the drum is in the upright position, lower the drum to the floor before releasing the cinch 

chain.

7.) Push the unit to the drum storage area and lower to the floor in an upright position.  Release the cinch chain from the 

ratchet by applying pressure to the ratchet handle in a clockwise direction with one hand and opening the pawl to free 

the ratchet with the other hand.  Remove the cinch chain link from the ratchet.

Maintenance

Periodic inspection for the general condition of structural and mechanical components is imperative for safe and efficient 

operation.

Periodically inspect all moving parts, framework, and contact areas for signs of wear, fatigue, or loosening.  Tighten, adjust, 

or replace parts as necessary to prevent failure and maintain proper function.

Inspect the hydraulic system for oil drips, hose damage, or other signs of wear.  Inspect the level and condition of the hydraulic 

fluid.  Replace any parts that show signs of wear.

Grease wheel bearings periodically. Oil or grease all moving parts including: the three clevis pins and the surfaces of the boom 

which contact the inside of the mast cap, the hinge pin, the gears and sprockets in the tilt drive, and the ratchet and pawl.

Worn or damaged parts must be properly replaced with the correct, genuine Morse parts.

Hydraulic pump is shipped filled with Noco Premium plus automatic transmission fluid d/m. Material safety data sheet 
(msds) is available online. Change oil yearly, sooner depending on dirty conditions or outdoor use.

 

Replace oil with Mobil 

dte 24 or equivalent for indoor use (Mobil dte 13 for outdoor use).

Summary of Contents for 400A-72SS-110

Page 1: ...tal camera at your receiving dock for this purpose Open packages expeditiously to check the condition of the goods There is only a 24 hour window to notify the carrier of any concealed damage IMMEDIATELY REPORT ALL DAMAGE TO THE SHIP PING COMPANY Then you may contact Morse for assis tance with your freight claim Morse Manufacturing will not be held responsible for any damaged freight that is not s...

Page 2: ...ly For operation only on clean level floors of suitable bearing capacity Do not use on sloped surfaces ramps irregular or debris strewn floors WARNING Do Not Modify the Unit Under no circumstances should any modifications be made to the Morse machinery without factory au thorization Any modifications may void the warranty This machine was designed to perform a specific job and alterations may resu...

Page 3: ...le a 55 gallon plastic drum with suitable top rim you must install either the Bracket Assembly or the Top Rim Clamp Part 4560SS P see figure 2 2 You can use the Top Rim Clamp to handle a 55 gallon plastic steel or fiber drum with suitable top rim Controls The Morse Hydra Lift Karrier is manually propelled and steered The drum lift and tilt controls are powered by a single phase 115V AC motor with ...

Page 4: ...it s middle using a cinch chain and ratchet tightening system The MORcinch drum holder accepts accessories for handling a plastic drum a fiber drum or smaller diameter drums see Options on pg 3 Operating Instructions 1 Push the Hydra Lift Karrier to the drum 2 Using the LIFT control as described in Machine De scription Controls page 3 position the drum holder assembly with the back band at the mid...

Page 5: ...t to the drum storage area and lower to the floor in an upright position Release the cinch chain from the ratchet by applying pressure to the ratchet handle in a clockwise direction with one hand and opening the pawl to free the ratchet with the other hand Remove the cinch chain link from the ratchet Maintenance Periodic inspection for the general condition of structural and mechanical components ...

Reviews: