
ZX
A
/ Z
XE
MORLEY-IAS
C
OMMISSIONING
M
ANUAL
Document No. 996-071, Revision:
1
,
Aug 99
Page
1
Commissioning Manual
1 Introduction
1.1 Notice
•
The material and instructions covered in this manual have been carefully checked for accuracy and are presumed
to be correct. However, the manufacturer assumes no responsibility for inaccuracies and reserves the right to
modify and revise this document without notice.
•
These instructions cover the commissioning and programming of both the ZXa and ZXe Fire Alarm Control
Panels. Refer to the Fire Alarm Control Panel Operator’s Manual for instructions on powering up and operating
the system. Refer to the relevant Installation Manual for instructions on installing the panel.
1.2 Warnings and Cautions
These instructions contain procedures to follow in order to avoid injury and damage to
equipment. It is assumed that the user of this manual is a suitably trained installer who is
familiar with the relevant regulations.
All equipment must be programmed to operate in accordance with the appropriate standards
and local regulations applicable to the installation.
Electro-static Sensitive Devices.
Take suitable ESD precautions when working inside the panel enclosure.
1.3 National Approvals
This equipment must be installed in accordance with these instructions and the appropriate national,
regional and local regulations specific to the country and location of the installation. Consult with the
appropriate Authority Having Jurisdiction (AHJ) for confirmation of the requirements.