Operators Guide
DigiBook 450
26
rel. 2.00-B
7
POSITIONING AND WORKSPACES
Positioning:
The Perfect Binder must be positioned so as to have a clear space around of at least 31in, and
around the work area at least 59.055in.
The room where the machine is installed must be properly ventilated with air change as required by
law.
Aree di lavoro
Glue Inspection Area
Glue loading area. The operator accesses to this area to load the glue
on the machine.
Access area for service, to reach the electrical and pneumatic panel.
Transit Area
Transit area from workplace to glue loading area.
Work Area for the Opera-
tor
Working area for the operator for normal use of the machine.
5500 NE Moore Court
Hillsboro, OR 97124
Toll Free: 1-800-944-4573
Local: 503-640-5920