The shut-off valve by the exchanger must be open and thus the flow of heating water ensured from the
hot water heating system.
It is recommended that an air release valve is fitted together with the shut-off valve on the inlet to the
exchanger, which according to requirement, especially at the beginning of the heating season, can be used to
vent the exchanger (fig. 1).
The period for heating required by the exchanger is dependent on the temperature and flow rate in the
hot water heating system. The combined heater is produced in a universal design – fitting of a shut-off valve to
the heating insert from the right or the left (fig. 1).
5.
OPERATION
Operating controls for heaters with volumes of 50 to 160L are located under the see-through cover of the control
panel.
HEATER PANEL FOR MORA-TOP NTR / Z and MORA-TOPV NTR with volumes of 50 to 160L
Thermostat dial
Signal light for el. circuit
Fold-down see-through cover
HEATER PANEL FOR MORA-TOP NTR and MORA-TOP NTR / HV with volumes of 50 to 160L
Operating equipment for heaters with volumes of 180, 200 and 250L
HEATER PANEL FOR MORA-TOP NTR / Z and MORA-TOPV NTR with volumes of
180, 200L
Thermostat dial
Signal light for el. circuit
Plastic cover for el. equipment
HEATER PANEL FOR MORA-TOP NTR
200 and 250L
and MORA-TOP 160 NTR / HV