![mopio BROOKLYN LIFT TOP COFFEE TABLE Assembly Instructions Manual Download Page 11](http://html1.mh-extra.com/html/mopio/brooklyn-lift-top-coffee-table/brooklyn-lift-top-coffee-table_assembly-instructions-manual_1832949011.webp)
BROOKLYN LIFT TOP COFFEE TABLE | 11
Step 11
Step 12
Screw Cambolt (A) to panel (1)
(don't over screw).
Plug in Dowel (D) into the holes
on (9).
Install panel (9) onto panel (1) by
inserting camlock (B) and
tightening it with a screw driver.
Please ensure the correct camlock
placing orientation. Check the
illustration carefully.
Place Sticker Cam (C) over the
Connecting Cams (B).
1
A
9
D
A
D
A
x2
x3
C
x3
B
x3
1
9
B
B
C
*Don’t screw too deep
Watch demo video at:
https://bit.ly/3Mer4HF
Missing parts? Or feeling stuck?
Chat with us at www.mopio.com#chat