0747-SOM-00002-02
Page 10 of 33
Hardware Installation & Configuration
The full DMD system is contained within 4 separate rugged deployment transit cases
These are
•
DMD SCU
•
DMD Instrument Deployment Case
•
DMD Diver to Surface
– Deployment Case
•
DMD Sonar Deployment Case
DMD Surface Control Unit (SCU)
The DMD SCU case is a self-contained rugged transit case featuring integrated connection points on
its rear which provide all the surface connections required which power run and deploy the system
onto a diver. Securely mounted within the DMD SCU are x2 Li-ion battery packs linked into an
intelligent charging circuit.
To comply with IATA shipping regulations the Toughbook laptop should not be
retained within the DMD SCU when the unit is presented for international air
transportation. The ‘Air Transportation Fuses’ at F1 & F2 on the rear of the SCU
should be removed and stored separately (this will isolate the Li-Ion batteries). The
Toughbook should be shipped separately within a purpose defined space contained
within the DMD Instrument Deployment case
Earth Connection Tab
Audio Comms Pass thru
Main Tether Connection
Transportation fuses
DC power Input