MAINTENANCE INSTRUCTIONS  – HYDRAULIC ROTARY ACTUATORS

GENERAL

 

MOOG FLO-TORK ROTARY ACTUATORS REQUIRE CLEAN, FILTERED 

HYDRAULIC OIL FOR SATISFACTORY OPERATION, THE SAME AS 

ANY OTHER HYDRAULIC COMPONENT. THE STANDARD BUNA-N 

SEALS ARE DESIGNED FOR PETROLEUM BASE FLUIDS. DURING 

 

RE-ASSEMBLY, TORQUE ALL BOLTS IN ACCORDANCE WITH 

TORQUE TABLE.

MODELS 900 THROUGH 30,000

MAXIMUM OPERATING PRESSURE: 3000 psi NON-SHOCK

KEY CONSIDERATION IN THE DISASSEMBLY OF THE UNIT IS DETERMINING THE PINION SHAFT 

KEYWAY RELATIONSHIP TO THE RACK POSITION TO MAINTAIN PROPER TIMING AT RE-ASSEMBLY.

NOTE:

  STANDARD UNITS ARE TIMED WITH THE PINION SHAFT KEYWAY AT 12 O’CLOCK 

WHEN LOOKING AT THE BEARING CAP SIDE AS SHOWN ON THE ENCLOSED TYPICAL DRAWING.

DISASSEMBLY
 1.  Remove all cylinder head tie bolts/tie rods.
 2.  Remove cylinder heads.
 3.  Determine the rack is at mid-point of travel (equal amounts of rack 

extended on each side of housing). Note and record pinion shaft 

keyway location for re-assembly.

 4.  Back off the bearing cap set screw. Using a spanner wrench, 

unscrew the threaded bearing cap from the housing.

 5.  Remove O-ring from housing.
 6.  Pull pinion from the housing with the bearing on it, placing unit 

over a pan or tub as it is filled with gear lubricating oil which will 

drain from the housing when the pinion is removed.

 7.  Remove the cylinder tubes.
 8.  Remove the piston/rack(s).
 9.  Remove the back bearing from the housing (if necessary).
10.  Remove all remaining O-rings and seals. Replace with new O-rings 

and seals at re-assembly.

11.  Thoroughly clean and inspect all parts for wear or damage.  

Replace with new parts as required. Lubricate with light oil before 

re-assembly.

RE-ASSEMBLY
 1.  Install new O-rings, back-up rings and seals in proper grooves  

(see drawing).

 2.  Install back bearing in housing.
 3.  Slide a cylinder tube over one end of the piston/rack assembly. If 

it is a double rack unit, slide a cylinder tube over one end of the 

second piston/rack assembly.

 4.  Slide piston/rack assembly and cylinder tube into the housing. If it 

is a double rack unit, slide both piston/rack assemblies and cylinder 

tubes into the same side of the housing.

 5.  Attach cylinder head(s) and bolts. Snug bolts up but do not torque 

until re-assembly is complete.

 6.  Center rack in housing. (Equal spacing of rack on both sides of 

housing.)

 7.  Install pinion with the shaft keyway location as noted during 

disassembly. (Standard unit timing will have keyway at 12 o’clock 

location when looking at the front mounting face.)

 8.  Install cylinder tube(s) on the other side of housing.
 9.  Attach cylinder head(s) and bolts. Snug bolts up, but do not torque 

until re-assembly is complete.

10.  Lay unit down and fill housing to top of the rack with ISO grade 68 

gear oil or other equivalent gear lubricant.

11.  Install front pinion bearing and O-ring.
12.  Install bearing cap. Tighten bearing cap until snug, then further 

tighten slightly to ensure a positive seal.

13.  Insert nylon locking pellet in bearing cap set screw hole. Tighten set 

screw locking bearing cap.

14.  Torque cylinder head bolts evenly by applying force alternately to 

opposite corners of the head. Torque values per bolt size are shown 

in the torque table.

Moog Flo-Tork 

     

1701 N. Main St. P.O. Box 68, Orrville, Ohio 44667-0068

PHONE: 330-682-0010                 FAX: 330-683-6857

900-30,000

MODEL NO.

FASTENER SIZE

RECOMMENDED TORQUE FOR 

CYLINDER HEAD BOLTS

900 & 1800

1/4 - 20

ft-lbs

3700 & 7500

5/16 - 18

12 

ft-lbs

15,000 & 30,000

7/16 - 14

22 

ft-lbs

TORQUE TABLE