8
1.3. Gas Connection
THE GAS CONNECTION MUST BE CARRIED OUT BY A ‘GAS-
SAFE’ REGISTERED GAS ENGINEER!
Connection to the gas supply should be with either rigid or
semi-rigid pipe, i.e. steel or copper. The connection should be
suitable for connecting to RC 1/2 (1/2 BSP male thread).
When the final connection has been made, it is essential that
a thorough leak test is carried out on the cooker and
installation. Ensure that the main connection pipe does not
exert any strain on the cooker. When a flexible tube is used,
make sure that it does not come into contact with hot areas
or adjacent housing units.
It is important to install the elbow correctly, with the shoulder
on the end of the thread, fitted to the cooker connecting pipe.
Failure to ensure the correct assembly will cause leakage of
gas.