Page 5
Part No. XG0106B
MD34-DV-2 Homefire
Installation
Installing Terminations with Built-In Frames
Installing Terminations with MSR Frames
12
12
1. Frame the termination opening to 12" x 12".
2. Fasten the termination to the studs using a minimum of 4
screws.
11
11
1.
Frame the termination opening to 11" x 11".
2.
Fasten the termination to the studs using a minimum of 4
screws.
Installing Terminations with MOSR Frames
12
12
12
MOSR
1.
Frame the termination opening to 12" x 12".
2.
Fasten the MOSR frame to the interior side of the studs using
a minimum of 4 screws.
3.
Insert the termination into the MOSR frame as shown here,
and attach by screwing through the four pilot holes in the
termination.
MSR
MTO-3
MTO-3F
MTO-3
MTKOG
1.
Ensure that the two long mounting brackets are facing the
bottom of the termination. (See inset). This will provide more
heat protection at the top of the termination, where tempera-
tures are highest.
2.
Attach to the faceplate of the termination using four sheet metal
screws.
Installing Heat Guards over Terminations