background image

© 2013 Monte Carlo Fan Company

7/1/2013

3

Before you begin installing the fan, Switch

power off at Service panel and lock service dis-

connecting means to prevent power from being

switched on accidentally.  When the service dis-

connecting means cannot be locked, securely

fasten a prominent warning device, such as a

tag, to the service panel.

Before installing this fan make sure the outlet box is
properly installed to the house structure.  To reduce
the risk of fire, electric shock, or personal injury,
mount to outlet box or supporting system acceptable
for fan support. (Mounting must support at least 35
lbs.)

Loosen the 2 set screws in yoke for

downrod to slip into yoke. Insert

downrod into yoke on top of the Fan

Body.  Align the hole in the Downrod

with the hole in the Yoke. Insert the

Pin through the Yoke and Downrod

until the point appears on the other

side.  Install the Keeper Pin

Tighten the 2 Set screws on the Yoke

once the downrod is in place. Check

motor for shipping stabilizers and re-

move if present.

Tread leadwires and safety cable first

through the canopy disk, Canopy and last

the downrod.

2

1

5

6

4

Canopy disk

Downrod

Canopy

Yoke

Cross Pin

Keeper 

Pin

Use metal outlet box suitable for fan support
and use only the screws provided with the out-
let box (must support 35 lbs). Before attaching
fan to outlet box, ensure the outlet box is se-
curely fastened by at least two points to a
structural ceiling member ( a loose box will
cause the fan to wobble). 

Use only the screws

provided with the outlet box.  

3

Downrod mount installation

Hang assembled fan from the mounting bracket in-
stalled to ceiling in previous step.  Make sure the fan
is hanging straight.  Rotate fan until the tab on the
Mounting bracket engages the slot on the Downrod
Ball.  This must be done to prevent the fan body from
rotating when the blades are in motion.

7

Make sure the studs protruding from the

bottom of the Mounting bracket are in-

stalled with threads all the way through

the bracket.  

9

For Canadian installation and for USA fan and light

kit combinations over 35 lbs, in both flush and

downrod modes the safety cable must be installed

into the house structure beams using 3” lag

screws, washers and lock washers provided. Make

sure that when the safety cable is fully extended

the lead wires are longer than the cable and no

stress is placed on the lead wires.

Note

:If Installing The Secondary Support Safety

Cable in the U.S., Do Not Remove Knockouts In

The Outlet Box.  

8

Safety cable installation

Safety Cable

Lag Screw

safety

cable

3” lag

screw

lock

washer

washer

Summary of Contents for 5OR52XXD-L Series

Page 1: ...card and retain as your proof of purchase DATE OF PURCHASE MODEL NUMBER RETAILER NAME RETAILER ADDRESS To register your fixture please visit our website www montecarlofans com 5OR52XXD L Series Fan Total fan weight with light kit UL Model No AC 552 1 8 11 kgs 17 84 lbs ...

Page 2: ... Use Mounting Screws Provided With The Outlet Box CAUTION For Compliance with Local Codes and Regulations If Installing The Secondary Support Safety Cable in the U S Do Not Re move Knockouts In The Outlet Box Mount the secondary support safety cable through the reserved nail screw hole on the outlet box to the building structure or the ceiling joist WARNING To reduce the risk of personal injury do...

Page 3: ...l outlet box suitable for fan support and use only the screws provided with the out let box must support 35 lbs Before attaching fan to outlet box ensure the outlet box is se curely fastened by at least two points to a structural ceiling member a loose box will cause the fan to wobble Use only the screws provided with the outlet box 3 Downrod mount installation Hang assembled fan from the mounting...

Page 4: ... through the canopy 12 Cover Ring Make wire connections to power source using wire nuts provided Make sure that no filiments are outside of the wirenut After making the wire connections the wires should be spread apart with the grounded con ductor and the equipment grounding conductor on one side of the outlet box and ungrounded conductor on the other side of the outlet box 11 Next lift the cover ...

Page 5: ...he Canopy Note For Canadian mounting refer to Step 8 21 Hands free hook Take 4 screws from hardware pack and insert 2 one on each side of bracket to match the L slot screw holes in canopy Keep 2 screws for later use 22 Replace the 3 screws removed and tighten securely Check motor for shipping stabilizers and remove if present 20 Place canopy over fan body align ing holes 19 Connect black and blue ...

Page 6: ...turning off the wall switch breaker or by remote Replace bulbs with the correct wattage bulbs turn the power on 31 Remove finial nut finial cap hex nut and rubber washer from fitter 32 Install finial cap and finial nut remove in step 32 threading the pull chains through each of the holes Hand tighten finial nut securely 34 Remove switch housing cap from light fixture by removing hex nut and lock w...

Page 7: ...e holes on switch housing and twist clockwise until tight 38 Loosen 2 the 2 screws which near the slot and remove one preassem bled screws from switch housing cover Keep screw for later use 36 slot Install plastic plug onto switch hous ing cover Plastic plug provided 37 Re install the screws removed in step 36 Tighten all screws securely 39 ...

Page 8: ...ure this distance from blade tip to ceilng Keeping measure within 1 8 rotate the fan until the next blade is positioned for measure ment Repeat for each blade If all blade levels are not equal you can adjust blade levels by the fol lowing procedure To adjust a blade tip down insert a washer not supplied between the blade and blade holder at the screw closest to the motor To adjust a blade tip up i...

Page 9: ...Dec 2010 Aircool spec Mar 2012 New format Jul 2013 Update for CUL regulation ...

Reviews: