© 2011 Monte Carlo Fan Company
2/11/2012
3
Insert downrod into motor y oke.
Next, insert clevis pin through y oke
and downrod and secure with cotter
pin.
Before you begin installing the fan, Switch power off
at Service panel and lock service disconnecting means
to prevent power from being switched on accidentally.
When the service disconnecting means cannot be
locked, securely fasten a prominent warning device,
such as a tag, to the service panel.
Before installing this fan mak e sure the outlet
box is properly installed to the house structure.
To reduce the risk of fire, electric shock, or per -
sonal injury, mount to outlet bo x or supporting
system acceptable for fan support.
(Mounting must support at least 35 lbs.)
Install the Mountiing Bracket to the
Outlet box.
Use only the screws
provided with the outlet box.
Remove keeper from pin . (see
inset) Loosen the 2 set screws in
yoke for downrod to slip into
yoke.
3
2
1
4
6
Thread wires and safety cable
through downrod with canopy and
yoke cover assembled.
5
Carefully lift fan assembly onto mounting
bracket. Rotate fan so that the notch on the
ball engages the ridge in the mounting br acket.
This will allow hands-free wiring.
8
7
Tighten both yoke set screws to fur -
ther secure downrod.
Fan and light kit combinations o ver 70 lbs, in
both flush and downrod mode the safet y cable
must be installed into the house structure
beams using the 3” lag screws,w ashers, and
lock washers. provided. Make sure that when
the safety cable is fully extended the lead wires
are longer than the cable and no stress is
placed on the lead wires.
9
Safety cable installation
Safety Cable
Lag Screw
safety
cable
3” lag
screw
lock
washer
washer
Summary of Contents for 3SU54 Series
Page 6: ......