3
The Refrigeration and Freezer bases are produced with the best possible material and workmanship.
PROPER INSTALLATION IS ESSENTIAL FOR SAFE AND EFFICIENT TROUBLE-FREE OPERATION.
THE INSTALLATION INSTRUCTIONS CONTAINED HEREIN ARE FOR THE
USE OF QUALIFIED INSTALLATION AND SERVICE PERSONNEL ONLY.
INSTALLATION OR SERVICE BY OTHER THAN QUALIFIED PERSONNEL
MAY RESULT IN DAMAGE TO THE EQUIPMENT AND/OR INJURY TO THE
OPERATOR.
Qualified installation personnel are individuals, a firm, corporation or company which either in
person, or through a representative are engaged in, and are responsible for:
A. The installation or replacement of the connection, installation, repair or servicing of equip-
ment, who is experienced in such work, familiar with all precautions required, and has
complied with all requirements of state or local authorities having jurisdiction. Reference:
National Fuel Gas Code Z223.1-latest addenda, Section 1.4.
B. The installation of electrical wiring from the electric meter, main control box or service out-
let to the electric appliance. Qualified personnel must be experienced in such work, be fa-
miliar with all precautions required and have complied with all requirements of state and
local authorities having jurisdiction. Reference: National Electric Code, N.F.P.A. No. 70–
latest addenda.
READ CAREFULY AND FOLLOW THESE INSTRUCTIONS
THIS UNIT WHEN INSTALLED MUST BE ELECTRICALLY GROUNDED
IN ACCORDANCE WITH LOCAL CODES, OR IN ABSENCE OF LOCAL
CODES, WITH THE NATIONAL ELECTRICAL CODE, ANSI/NFPA No.70–
LATEST ADDENDA.
PROVISIONS MUST BE MADE FOR ADEQUATE AIR SUPPLY TO THE UNIT.
Summary of Contents for RB108R
Page 17: ...17 EXPLODED VIEW 1...
Page 19: ...19 17 EXPLODED VIEW 2...
Page 22: ...22 EXPLODED VIEW 3...
Page 27: ...27...