![Monogram Advantium ZSB9121NSS Installation Instructions Manual Download Page 7](http://html1.mh-extra.com/html/monogram/advantium-zsb9121nss/advantium-zsb9121nss_installation-instructions-manual_1827694007.webp)
31-7000078 Rev.0
7
Standard Installation Preparation
PREPARE THE OPENING
(CONT.)
Installation over another Advantium Built-In
Oven:
27 or 30
Ǝ
23-1/2
Ǝ
25-1/4
Ǝ
17-1/2
Ǝ
2 1/2
Ǝ
Min.
(3 1/2
Ǝ
Recommended)
17-1/2
Ǝ
Construct
solid bottom - Min.
3/8” plywood
supported
on all four sides.
Must be able to
support weight
of oven and
contents.
• If you are mounting a Built-In Advantium Oven over
another, use the dimensions shown. The middle rail
separating the two openings may need to be larger
than the 2
Ǝ
minimum shown.
PREPARE THE OPENING
(CONT.)
Installation under a Microwave Oven and over
a Warming Drawer:
27 or 30
Ǝ
23-1/2
Ǝ
25-1/4
Ǝ
17-1/2
Ǝ
2
Ǝ
Min.
(3
Ǝ
Recommended)
Per Microwave
Oven Requirement
3.5
Ǝ
Min.
(4.5
Ǝ
Recommended)
Per Warming
Drawer
Requirement
Construct
solid bottom - Min.
3/8” plywood
supported
on all four sides.
Must be able to
support weight
of oven and
contents.
NOTE:
Additional clearances between the cutouts
may be required. Check to be sure the oven supports
above the Warming Drawer location do not obstruct
the required interior depth and height. See Warming
Drawer installation instructions for details.
CAUTION
For personal safety, the
mounting surface must be capable of supporting the
cabinet load, in addition to the added weight of the
oven and drawer, plus additional oven loads.
Summary of Contents for Advantium ZSB9121NSS
Page 1: ...INSTALLATION INSTRUCTIONS Advantium Built In Wall Oven 120V 27 ENGLISH ESPA OL MONOGRAM COM...
Page 13: ...31 7000078 Rev 0 13 Notes...
Page 14: ...14 31 7000078 Rev 0 31 7000078 Rev 0 08 19 GEA Printed in China...
Page 15: ...INSTRUCCIONES DE INSTALACI N Horno Advantium 120V 27 ESPA OL MONOGRAM COM...
Page 28: ...14 31 7000078 Rev 0 31 7000078 Rev 0 08 19 GEA Impreso en China...