5
SECTION 2
INSTALLATION
The cabinet installation should only be carried out by suitably qualified persons.
•
The cabinet should be sited in a draught free position and in accordance with
guidelines laid out in BS14175.
•
The cabinet should be connected to a suitable fan/duct system with electrical
connections made to fan speed controller/duct damper as appropriate.
•
Connect the cabinet to a 13A outlet socket.
•
Optional Aux power sockets are provided with separate power plugs.
•
Optional services (water/gas etc.) are supplied with connections located inside
the removable side panel. Remote valves are located on the same side as the
respective services where fitted and are clearly marked.
•
As standard, the system relies on Variable air volume. A 0-10v terminal is
provided for connection to a VAV fan inverter drive or servo driven variable duct
damper valve. Electrical connections are located under the access cover behind
the front cover.
TESTING / COMMISSIONING
A test certificate will be supplied for conformity to CE marking, and electrical test.
The airflow should be checked using a vane anemometer and the results recorded.
THE CABINET MUST BE TESTED EVERY 14 MONTHS TO COMPLY WITH
C.O.S.H.H REGULATIONS.