6
General Valve Installation
Water Pressure
20 – 70 psi (1.5 – 5bar)
Existing Plumbing
Free of any deposits or build-ups inside pipes
Softener Location
Locate close to drain and connect according to local
plumbing regulations
Bypass Valve
Always provide for a bypass valve if unit is not
equipped with one
CAUTION
•
Do not exceed 120psi (8.3 bar)
•
Do not exceed 49°C (120°F)
•
Do not subject the unit to freezing conditions
Planning the installation
Locate the softener tank and brine
tank close to a drain where the
system will be installed. The surface
should be clean and level.
Perform all plumbing according to
local plumbing codes.
Use a ½” minimum pipe or tubing
size for the drain line.
Flexible drain line should be limited
to 2 metres.
Any solder joints near the valve must
be done before connecting any
piping to the valve. Always leave at
least 6” (152 mm) between the valve
and joints when soldering pipes that
are connected to the valve. Failure to
do this could cause damage to the
valve.