Mollet MSD-070 Quick Start Manual Download Page 2

[

2.  Installation

 

  gasket at the provided flange or flange socket and fix it with

2.3  Electrical connection

 

Circuit diagram

 

  instructions, before handling with the device !

2.2  Mounting in the vessel

 

-  Weld the flange socket (as a option) vertical (Flange is horizontal)

2.1  Preparation

 

-  Position the pressure detector (Flange is horizontal) with the

 

-  Check the membrane of visual transport damage.

 

-  Read and follow the safety instructions and the operating

 

  4 washers and screws M8.

 

  in the silo top.

2.4  Cable gland

 

-  After electrical connection, tighten the cable gland.

 

-  Screw the cap nut, until the cable entry is closed tightly.

2.5  Cable run

 

Run the connection cable in a way that no traction can occur at the

 

pressure detector.

 

-  The switching point is adjusted at 40 mbar.

2.6  Switching point

 

-  A modification may be carried out by the manufacturer only.

M   LLET

Füllstandtechnik

GmbH

02

      MSD-BA        04/13

  ©

 by MOLLET

Operating instructions           MOLLET   D-74706 Osterburken  Tel.  +49  6291 6440-0  Fax  +49  6291 9846

008-0700

 

  the silo or vessel and the electrical connection have been done

 

  correctly.

3.  Utilization

 

-  The pressure detector must not be modified. If there is any

 

  modification, the warranty of the manufacturer will be, cancelled.

3.3  Inexpert handling

 

-  Put the pressure detector into operation only, if the installation in

 

-  Damaged devices have to put out of operation immediately.

 

-  Comply with the specifications on the data plate.

 

-  Use the pressure detector in its intended application only.

3.2  Normal operation

3.1  Commissioning

 

-  The disposal applies to the valid environmental guidelines

 

  conditions.

4.  Maintenance and servicing

 

-  Ignoring of the safety instructions and the operating instructions.

 

-  Not intended use.

 

  maintenance.

 

  manufacturer only.

 

-  In case of intended use, the silo pressure detector needs no

 

-  The servicing of the pressure detector may be carried out by the

 

-  Store the pressure detector dry and dust-free.

-

6.  Disposal

 

-  The pressure detector can be recycled.

-

4.1  Maintenance

 

  according to the location of the carrier and the local manufacturing

-

 

-  Violation against applicable law and standards.

5.  Storage

 

-  Modification at the device or of the switching point adjusting.

-

 

-  Protect the membrane from damage.

4.2  Servicing

008-AP00

P

2

3/4

1

PE

NC

NO

C

1

2

3/4

40 mbar

MOLOS

Silo pressure detector

MSD