Docon SealM
Docon Seal
Setup and commissioning
Page 31 of 68
4.4.1
Connecting and commissioning the Docon Seal
1. Set up the device in the desired position with the base facing
downwards.
2. Connect the power cable on the back of the housing to the Do-
con Seal power socket.
3. Insert the power cable into a socket.
4. Turn on the Docon Seal by pressing the on/off button.
5. The LED of the on/off switch lights green.
Further steps as described in
Chapters
4.3.2 to 4.3.4.
4.5
Overview of button signal statuses
Status
Colour
LED
Ready for operation
Green
Lit
Remaining capacity of battery 10-
30%
(Docon SealM only)
Green
Flashing
Residual capacity of battery <10%
(Docon SealM only)
Orange
Flashing
Error status or BATTERY empty
Orange
Lit
Charging
(Docon SealM only)
Orange
Flashing
Charging complete
(battery fully charged)
(Docon SealM only)
Green
Lit
Summary of Contents for Docon Seal
Page 1: ...Docon SealM Docon Seal Mobile sealing unit Instructions for use en...
Page 2: ......
Page 4: ...Page 4 of 68...
Page 9: ...Page 9 of 68 IMPORTANT READ CAREFULLY PRIOR TO USE KEEP IT FOR LATER REFERENCE...
Page 65: ......
Page 66: ......
Page 67: ......