Molift MOVER 205 Operating Manual Download Page 14

Page 14 of 24

BM05101 Molift Mover 205 English - Rev. J/ 10/2012

Move the lifter around chair. 

  If the transfer is from a wheelchair, the brakes 

must  be  locked  to  prevent  the  wheelchair 
from rolling away.

Raise/lift user above seat height, and perform the 
transfer. It is not necessary to lift the person very 
high.

Lift and transfer to (wheel)chair

Manoeuvre the lifter so that the user is as far back 
in the (wheel)chair as possible.

  If the transfer is from a wheelchair, the brakes 

must  be  locked  to  prevent  the  wheelchair 
from rolling away.

When  lowering,  you  can  use  the  following  tech-
niques or a combination of them to position and 
get the user seated far back in the chair.

•  push gently on the knees
•  pull the loop on the back of the sling
•  tilt the chair slightly backwards

Lower the user into chair, unhook sling from sus-
pension and remove the lifter.

Removal of sling

Gently pull leg section to the side, out from the us-
er’s thighs. Standing by the side of user, lean her 
forward - supporting with one hand. Pull sling up 
from behind her back. 

  Pulling sharply on sling may cause user to fall 

forward  resulting  an  injury.  Always  support 
the user by keeping one arm around the user’s 
shoulder  when  fitting  or  removing  the  sling 
(see illustration).

  If the users physique and ability allows it, the 

user should be encouraged to take active part 
in fitting the sling. The user can lean forward, 
lift her tights and help placing the leg section.

Bathing

The procedure for lifting to/from the bath is in prin-
ciple the same as for to/from bed. A special bath-
ing sling is used for this purpose. This sling dries 
quickly and may be washed at 85°C.

Summary of Contents for MOVER 205

Page 1: ...BM05101 Molift Mover 205...

Page 2: ...heel chair 13 Bathing 14 Toileting 15 Equipment 16 Quick release suspensions 16 Supporting arms 16 Castor with directional lock 16 Molift Stretcher 17 Integrated charger 17 Chassis Low base 17 Accesso...

Page 3: ...damage or malfunctions re sulting from failure to comply with the instruc tions Warranty claims must be made immediately on detecting the defect Remember to quote the serial number Consumable parts ar...

Page 4: ...ions General Before putting a Molift Mover 205 into operation the operator must ensure that the lifter and acces sories are in good working order especially with regards to safety All instruction and...

Page 5: ...intended for lift ing and transferring persons to from bed floor chair or similar wheelchair and toilet The lifter is made out of light weight materials has castors and is powered by a battery It has...

Page 6: ...12 V DC Battery 26 4 V NiMH 2 2 Ah ATO Fuse 20 A Battery charger Type 2215MV 10 22 cells NiCd NiMH Protection IP24 Number of lifts with fully charged battery 75 lifts 75 kg 50 cm SWL Safe Working Load...

Page 7: ...5 to 70 C Assembly The chassis should be rolled out of the box The battery must not be in the battery holder during assembly Place the column in the attachment on the chassis and push the column down...

Page 8: ...embly The lifter can be disassembled in three parts by removing the suspension and then the lift ing column with arm from the chassis Remove the suspension Run the lifting arm all the way down towards...

Page 9: ...gency stop button is situated on the battery holder Push the red button to cut the power to the motor Turn the button clockwise until it pops up to reset the emergency stop Emergency lowering It is po...

Page 10: ...from colliding with these objects The lifter shall not be used to lift or move users on sloping surfaces Avoid deep pile carpets high thresholds uneven surfaces or other obstacles that may block the c...

Page 11: ...entre of the sling should be parallel with the users spine Roll her then onto her back Pull the leg loops forward and under the thighs as shown Cross the loops one through the other If the user has a...

Page 12: ...ifter away from bed Beware of obstructions under the bed that can cause castors to stop or tip Lift to bed Centre the user over the bed and turn her so that the feet point to the foot end of the bed L...

Page 13: ...1 Lowering to floor Place a pillow on the chassis or on the floor to pro tect the users head and neck not necessary if you are using a sling with head support Otherwise as described above Lift and tra...

Page 14: ...p on the back of the sling tilt the chair slightly backwards Lower the user into chair unhook sling from sus pension and remove the lifter Removal of sling Gently pull leg section to the side out from...

Page 15: ...ection under the front part of the thighs and pull the loops up between the thighs By pulling the leg sections from the inside and out you will achieve a wider leg position On Molift EasyToilet Comfor...

Page 16: ...es and supporting arms Replace the complete column according to As sembly instructions on page 7 Read the operating manual that comes to gether with the Supporting arms Castor with directional lock Pa...

Page 17: ...socket to charge the battery Chassis Low base Part no 1420002 The chassis can be replaced with one with low er legs This is suitable for level and even surfac es where the lifter legs must fit under...

Page 18: ...00 Art no 3024500 Molift Basic Full Sling Size With head support S Part no 3047010 M Part no 3074011 L Part no 3047012 Molift Easy Toilet Sling Size No head support With head support XXS Art no 303205...

Page 19: ...isible damages or cracks as it may cause personal injury or damage to the lifter Monthly maintenance Check the lifter and the suspension especially for damage Make sure there is no loose parts on the...

Page 20: ...order to locate the error See the table for troubleshooting Symptom Possible cause action The lifting col umn is wobbly The lock handle is not locked properly or the lifting column is out of position...

Page 21: ...anual please contact lo cal authorised service representative If you do not know whom to contact locally please contact your dealer or Etac AS to get help Labelling The main label is placed on the col...

Page 22: ...Page 22 of 24 BM05101 Molift Mover 205 English Rev J 10 2012 Checklist for periodic inspection...

Reviews: