
EHC22(E)-r0/120601
- 9 -
EHC22 – Main Frame Ass’y (3/3)
A1
P1
B1
P2
A2
B2
GB
B
A
Section B
7, 8, 9
4
3
33, 34, 35
Important!
Check the hose connections between the speed-up valve and the cylinders.
The left and right cylinders should be fitted on correct position as shown in
the drawing. Refer to the markings 'L/R' near the ports on the cylinder rods.
Connect to
left cylinder
Connect to
right cylinder
22-MFA3-0-E
}
{
A
B