background image

INSTRUCTIONS FOR ADJUSTING LEVELERS:

 

   

MAINTENANCE INSTRUCTIONS:

 

   

ASSEMBLY COMPLETE.

POSITION THE BED IN YOUR ROOM.
LOCATE LEVELERS UNDER EACH

TURN COUNTER-CLOCKWISE TO
EXTEND

CLOCKWISE

 

TO

 

RETRACT

.

ADJUST LEVELERS UNTIL EACH LEG

REMOVE BOX SPRING AND MATTRESS 
BEFORE MOVING YOUR BED.

LIFT YOUR BED WHEN MOVING IT.
DRAGGING CAN DAMAGE 
CENTER SUPPORT.

READJUST LEVELERS AFTER MOVING 
YOUR BED.

SUPPORT LEG ( I ).

SUPPORT IS APPLYING EQUAL UPWARD
PRESSURE ON THE CENTER SLAT.

MONTY WALL BED

 

ASSEMBLY INSTRUCTIONS

C.KING/E.KING 

STEP  

7

B/C

   

G

   

E

   

H

  

F

   

E

   

H

   

F

   

E

   

H

   

F

   

A

   

   

   

D

   

UPDATED:

JULY

 

25TH

, 202

2

Summary of Contents for MONTY MCHCH5

Page 1: ...CKED IN BOX 1 ALLEN BOLT 5 16 x2 8 PCS FLAT WASHER 5 16 16 PCS LOCK WASHER 5 16 16 PCS ALLEN KEY 5 16 1 PC 6 HARDWARE PACKED IN BOX 3 ALLEN BOLT 5 16 x1 4 PCS ALLEN BOLT 5 16 x2 1 2 2 PCS FLAT WASHER 5 16 6 PCS LOCK WASHER 5 16 6 PCS ALLEN KEY 5 16 1 PC 1 2 3 4 5 ALLEN KEY 1 4 1 PC 5 1 ALLEN BOLT 1 4 x1 8 PCS MONTY WALL BED ASSEMBLY INSTRUCTIONS QUEEN C B RIGHT SIDE RAIL 1 PC R 1 PC BOX 2 LEFT HEA...

Page 2: ...O STEP 4 IF USING BED WITH AN ADJUSTABLE MATTRESS BASE SKIP STEPS4 5 6 7 AND REFERENCE APPENDIX A ADJUSTABLE MATTRESS BASE ASSEMBLY SUPPLEMENT MONTY WALL BED ASSEMBLY INSTRUCTIONS QUEEN A B C A 5 5 A B C A C B STEP 3 NOTE USE HARDWARE PACKED IN BOX 1 FOR STEP 1 R L A A C B D UPDATED JULY 25TH 2022 B C B C ...

Page 3: ... STEP 5 STEP 6 STARTING FROM HEADBOARD 1 F A D 3 4 5 B C G G MONTY WALL BED ASSEMBLY INSTRUCTIONS QUEEN 2 F I I 4 3 5 F I NOTE USE HARDWARE PACKED IN BOX 3 FOR STEPS 4 5 A C B D A C B D UPDATED JULY 25TH 2022 ...

Page 4: ... TO RETRACT ADJUST LEVELERS UNTIL EACH LEG REMOVE BOX SPRING AND MATTRESS BEFORE MOVING YOUR BED LIFT YOUR BED WHEN MOVING IT DRAGGING CAN DAMAGE CENTER SUPPORT READJUST LEVELERS AFTER MOVING YOUR BED SUPPORT LEG I SUPPORT IS APPLYING EQUAL UPWARD PRESSURE ON THE CENTER SLAT MONTY WALL BED ASSEMBLY INSTRUCTIONS QUEEN STEP 7 B C G E H F E H F E H F A C B D UPDATED JULY 25TH 2022 ...

Page 5: ...PARTS ARE NOT REQUIRED FOR ADJUSTABLE MATTRESS BASE INSTALLATION USE A PHILLIPS HEAD SCREWDRIVER NOT PROVIDED TO UNSCREW THE PHILLIPS SCREWS AND REMOVE THE PRE ASSEMBLED SIDE RAIL CLEATS STEP 1 F CENTER SLAT SUPPORT 1 PC E SLAT 26 PCS G SIDE RAIL SLAT CLIP 26 PCS H CENTER SUPPORT SLAT CLIP 13 PCS I 2 PCS SLAT SUPPORT LEG UPDATED JULY 25TH 2022 ASSEMBLY INSTRUCTIONS QUEEN MONTY WALL BED WARNING SID...

Page 6: ... 12 PCS ALLEN KEY 5 16 1 PC 1 2 3 4 5 ALLEN KEY 1 4 1 PC 5 1 ALLEN BOLT 1 4 x1 8 PCS MONTY WALL BED ASSEMBLY INSTRUCTIONS C KING E KING E F G H I B C C D FOOTBOARD 1 PC E SLAT 39 PCS F CENTER SLAT SUPPORT G SIDE RAIL SLAT CLIP 26 PCS H CENTER SUPPORT SLAT CLIP 26 PCS I SLAT SUPPORT LEG 4 PCS LEFT SIDE RAIL 1 PC 2 PCS HARDWARE SET B RIGHT SIDE RAIL 1 PC R L R 1 PC BOX 2 L 1 PC 00 30 x2 MONTY WALL B...

Page 7: ...NG BED WITH AN ADJUSTABLE MATTRESS BASE SKIP STEPS4 5 6 7 AND REFERENCE APPENDIX A ADJUSTABLE MATTRESS BASE ASSEMBLY SUPPLEMENT MONTY WALL BED ASSEMBLY INSTRUCTIONS C KING E KING 5 2 4 3 R L A A A 5 5 A A C B D B C D 5 5 D B C A C B D UPDATED JULY 25TH 2022 NOTE USE HARDWARE PACKED IN BOX 1 FOR STEP 1 B C B C ...

Page 8: ... 1 F A D 3 4 5 B C G G MONTY WALL BED ASSEMBLY INSTRUCTIONS C KING E KING 2 F I I 4 3 5 F I F I I A C B D A C B D NOTE USE HARDWARE PACKED IN BOX 3 FOR STEPS 4 5 STEP 6 STARTING FROM HEADBOARD UPDATED JULY 25TH 2022 ...

Page 9: ...RETRACT ADJUST LEVELERS UNTIL EACH LEG REMOVE BOX SPRING AND MATTRESS BEFORE MOVING YOUR BED LIFT YOUR BED WHEN MOVING IT DRAGGING CAN DAMAGE CENTER SUPPORT READJUST LEVELERS AFTER MOVING YOUR BED SUPPORT LEG I SUPPORT IS APPLYING EQUAL UPWARD PRESSURE ON THE CENTER SLAT MONTY WALL BED ASSEMBLY INSTRUCTIONS C KING E KING STEP 7 B C G E H F E H F E H F A C B D UPDATED JULY 25TH 2022 ...

Page 10: ... ARE NOT REQUIRED FOR ADJUSTABLE MATTRESS BASE INSTALLATION USE A PHILLIPS HEAD SCREWDRIVER NOT PROVIDED TO UNSCREW THE PHILLIPS SCREWS AND REMOVE THE PRE ASSEMBLED SIDE RAIL CLEATS STEP 1 F CENTER SLAT SUPPORT 2 PCS E SLAT 39 PCS G SIDE RAIL SLAT CLIP 26 PCS H CENTER SUPPORT SLAT CLIP 26 PCS I 4 PCS SLAT SUPPORT LEG MONTY WALL BED ASSEMBLY INSTRUCTIONS C KING E KING UPDATED JULY 25TH 2022 WARNING...

Reviews: