Install the mounting
12.5mm
screw
Punching metal
9.5mm +12.5mm
12.5
12.5
12.5
12.5
9.5
9.5
9.5
9.5mm +9.5mm
12.5mm +12.5mm
1
2
3
4
2
3
Decorate the ceiling to finish.
4
a
b
b-1
b-2
b-3
b-1
b-2
b-3
a
b
TRIMLESS
FRAME
in the opening of the ceiling
Open the mounting hole
and insert the frame.
After adjusting the thickness
of the board, secure the
punching metal to the box with
screw securely.
Secure the punching metal
to the implant box with screw.
Finish the surface of the ceiling
board and the box with
cheesecloth undercoat and
putty.
For ceiling construction,it becomes
contractor's work, but be careful
on the cautions of the construction.
When constructing, make sure
the putty is securely finished
and there will be no crack.
Make sure there will be no ceiling
paint on the opening of the box.
Make sure to have the ceiling
surface and the opening to
become flush.
Butter muslin
Paint
Putty
Ceiling board
Surface finish
Recommended hole
dimension for mounting
162×162
To install ModuleX safety
Installation Details
Installation Diagram
Caution
Caution
Installation Diagram
Installation Details
Ceiling cut out
screw
Ceiling board
Ceiling board
Ceiling board
Ceiling board
Mounting
Installation Guide
MMT-101/TLF/01
5/F, Longbow House,14-20 Chiswell Street, London, EC1Y 4TW, UK
Tel : +44-01273-616649
Concord Lighting
(Contact)
(Manufacturer)
ModuleX Inc.
#21 AraiBldg, 1-20-6 Ebisu-Minami Shibuya-ku, Tokyo
Tel : +81-3-5768-3131