Modulex MMT-101/TLF/01 Installation Manual Download Page 2

Frame

1

Install the mounting

12.5mm

screw 

Punching metal

9.5mm +12.5mm

12.5

12.5

12.5

12.5

9.5

9.5
9.5

9.5mm +9.5mm

12.5mm +12.5mm

2

3

Decorate the ceiling to finish.

4

a

b-1

b-2

b-3

b-1

b-2

b-3

a

b

TRIMLESS 

FRAME

in the opening of the ceiling
Open the mounting hole

 and insert the frame.

After adjusting the thickness
of the board, secure the 

punching metal to the box with

screw securely.

Secure the punching metal

to the implant box with screw.

Finish the surface of the ceiling

board and the box with

cheesecloth undercoat and 

putty.

For ceiling construction,it becomes

 contractor's work, but be careful
 on the cautions of the construction.

When constructing, make sure

the putty is securely finished

and there will be no crack.

Make sure there will be no ceiling

 paint on the opening of the box.

Make sure to have the ceiling 

surface and the opening to 

become flush.

Butter muslin

Paint

Putty

Ceiling board

Surface finish

Recommended hole

dimension for mounting

162×162

To install ModuleX safety

Installation Details

Installation Diagram

Caution

Caution

Installation Diagram

Installation Details

Ceiling cut out

screw 

Ceiling board

Ceiling board

Ceiling board

Ceiling board

Mounting

Installation Guide

MMT-101/TLF/01

5/F, Longbow House,14-20 Chiswell Street, London, EC1Y 4TW, UK

Tel : +44-01273-616649

Concord Lighting

(Contact)

(Manufacturer)

ModuleX Inc.

#21 AraiBldg, 1-20-6 Ebisu-Minami Shibuya-ku, Tokyo

Tel : +81-3-5768-3131

Reviews: