To install ModuleX safety

MMP-130A/40BZ1/2

Installation Details

Installation Diagram

Caution

Locate fixture between joists.

Extend bar hangers to fit between 

joists. Position fixture by hammering 

nails into joists. Bar hangers should 

be level with bottom of joists.

1

Installation in New Construction

2

Wiring connection

Installation Guide

R

MUSEUM platform / Adjusytable downlight

Installation Details

Installation Diagram

Caution

Cut out a hole and install the 

mounting frame

Mounting frame

1

Install the mounting equipment 

for ceiling cut out

Slide the metal fittings from upper 

side

On step 2, please fix the metal 

fitting firmly with your fingers. 

If not, it may cause falling of fixtures

Metal fitting

Ceiling cut out

Use a screw driver and tighten the 

metal fittings

1

2

2

3

a

a

b

b

3

Standard to screw

torque 1.0〜2.0N・m

Push tight

Φ130

Make sure to tighten the metal 

fittings securely with a screwdriver. 

(torque 1.0 〜2.0 N・m) If it is loose,

 it may cause falling of the fixture

Ceiling

h

i

Ceiling Line

Bar hanger lip fits

against joist bottom

1

2

1

2

3

Remove the fixture wiring box

cover.

Remove appropriate round knock-

out(s) and connect conduit to

wiring box with proper connect-

or(s)(not included).

for metal conduit

Provide electrical service according

to the “National Electrical Code” or

your local electrical code from a

suitable junction box to the

wiring box(located on the plaster

frame).Supply wire insulation must

be rated for at least 75℃.

Make certain no bare wires are

exposed outside the connectors.

Connect supply wires to wires in

fixture wiring box with proper size

wire nuts(not included).Be sure

to cover all bare current carrying

conductors.Connect white to white;

black to black; and  green or bare

copper wire(from electrical service)

to bare copper wire(in wiring box)

2

4

Place wires and connections back in

wiring box and replace cover.

Install with MINIMUM SPACINGS

between (a) center-to-center

of adjacent luminaires: 

600  mm ( 24̲ in); 

(b) top of luminaire to 

overhead building member: 

200 mm ( 8 in);

 (c) luminaire center to  side 

building member: 

300 mm ( 12 in)

(a)

(a)

(b)

(c)

DRIVER

*Wire nuts by  others.

BLACK

WIRE NUT*

BLACK

WHITE

WHITE

WIRE NUT*

WIRE NUT*

GREEN OR BARE

GREEN OR BARE

3

PURPLE

GREY

CAPPED 0-10V

CONTROL  WIRES

TO 0-10V DIMMER