FR-W1803-44
Axis Instructions
14
10. Carefully reinstall the hanger ball onto the downrod, being sure
that the cross pin is in the correct position, the setscrew is
tightened and wires are not twisted (Fig. 2C). A loose set screw
could create fan wobble.
11. Carefully lift the fan motor assembly up to the mounting
bracket and seat the hanger ball in the mounting bracket socket.
Make sure the tab on the mounting bracket socket is properly
seated in the groove in the hanger ball (Fig. 2D). Rotate the
socket assembly until the ball drops and locks into
the hanger bracket screw. You may cut off excess lead wire
approximately 6-9 inches above the top of the downrod. Strip
insulation off 1/2 inch from the end of each lead wire. Make sure
you have the correct down-rod size prior to cutting said lead
wire. Make sure the electrical supply wires, including the hanger
bracket grounding wire and safety cable are pulled through the
downrod, between the hanger bracket and the outlet box so that
electrical connections can be made later.
12. Secure the safety cable into the structure beams using the wood
screw, washers, and spring washers provided (Fig. 2D).
NOTE:
A Safety cable is required for all installations in Canada.
Safety cable is required for ceiling fan and light combinations over
35 lbs. in both flush and downrod models in the United States.
2. Hanging the Fan