Electrical Connections
Warning:
Turn off power at the service box before wiring
Duct Connections
Warning: To reduce risk of fire, use only metal ductwork.
1. Power supply for
the ventilator is
115v AC 60HZ
2. Remove top
enclosure of the
ventilator for
access to the
wiring terminal
block.
3. Push the electrical
cable up through
the bottom knock
out of the external
blower body. Pull
enough wire up
into the housing to make attachment to the terminal block.
4. Connect white to “NEUTRAL”, green to “GROUND” and the speed control wire to
“HOT”.
1. Use only round metal ducting, elbows and
transitions or rectangular ducting having
equivalent area of square inches as per
required duct size.
2. Tape all joints with UL 723 classified metal
multi purpose duct tape.
3. Turn on power and check ventilator operation
4. Make sure damper opens and closes freely
5. Install top enclosure of the ventilator.
Summary of Contents for EM1400
Page 3: ......