![Moderator Biomaster 15 Instruction Manual Download Page 19](http://html1.mh-extra.com/html/moderator/biomaster-15/biomaster-15_instruction-manual_1817685019.webp)
Biomaster Boiler 15-30 Instruction Manual
17
For the boiler to start functioning once again, unscrew the black screw on the
temperature limiter and press the button beneath it. The button can be pressed with,
for example, a match. When pressed, a characteristic “click” is heard.
The button should be pressed after the temperature on the boiler drops
to about 50°C.
Burner connection
Cable connecting the boiler with the burner is placed inside the boiler casing (1,
Fig. 2.8.2). At the end of the cable there is a multiple socket. The socket at the end of
the cable must be connected to the plug on the burner chassis. Connecting to the
plug is possible only in one particular position. During installation socket must be
inserted into the plug, and find the appropriate position in order to insert it. To avoid
accidental disconnection, turn the ring 1/4 of a turn clockwise until you hear a
characteristic snap. In this moment socket is connected properly. Dismantling should
be conducted in the opposite sequence.
Connecting the feeder container
First, mount the container feeder. Then, connect the cable by the feeder engine to
the socket on the burner chassis (4, Fig. 2.8.2).
After connecting the cables, they must be placed in such a way as to
prevent the contact with a metal loading pipe and flexible “spiro” pipe.
The risk of melting insulation of cables.
Figure 2.8.1. Elements of the controller
– front view