14
Midor
Midor iOS
User Guide rev. 1.1
Projects
Project
M
anagement
The project management in the Midor measuring instrument makes the work in the real technology
easier. You can prepare the project you need to measure directly in the Midor measuring
instrument. You can then store two values for each branch of the project - the initial status of the
branch before balancing and its status after balancing. From the data of the whole project you can
then print a report on the project status before balancing and the report on balancing.
For the project measurement you select the respective project and branch. The Midor measuring
instrument will set the valve and its preset automatically and you are ready for measuring. The
measured data will be again stored automatically in th
e project’s correct fields.
You can find in the
Projects
introductory screen two tabs -
Projects
a
Branches
.
Project Window, Project Tab
In the
Project
tab, the input data of the project is entered or measured, such
as
Project name
,
File name
for storing projects,
Project input pressure.
If
the
Common valve
is used in the project, change the position of the sliding
button. Then, you have to specify and enter the
Valve type
and
Initial preset
.
Once the system is balanced, you can also specify and enter the
Balanced
status preset
.