ASSEMBLY INSTRUCTIONS
Larry Hartwell
812-592-2945
1) Remove from cartons & place on flat surface.
2) Place lift so that logos are to the outside.
3) Install 2 bridge assemblies with 1/4" x 1-3/4” bolts flat washers & lock nuts provided,
match up numbers. (snug bolts only for now)
4) Connect hoses to 90 degree fittings on cylinder. (do not use teflon tape on
these connections)
5) Fill reservoir with oil, non-synthetic automatic trans fluid is recommended
6) Using remote raise lift to upright position & tighten bridge bolts Install 1" riser blocks
if needed.
7) We recommend a Group U1 Lawn mower battery with a minimum of
300 cranking amps.
8) Air pressure on back side of piston (tank on side of cylinder) comes preset at 50 PSI
left side and 70 PSI right side, this is the correct setting 99% of the time, see
operating instructions on how to adjust if needed.
9) See attached drawing for handle assembly. (aluminum lifts only)
Thanks, for choosing the E-Z Lift, if you have any questions
or concerns, please contact us.
Caution!!! Make sure hoses are routed UNDER cross brace, as shown,
failure to do so will damage lift & void warranty!!!
L
IFT
DELUXE
!
Summary of Contents for E-ZLIFT DELUXE
Page 5: ...HANDLE ASSEMBLY ...