
18
CX-3
®
OPERATION
Standard Operation
The following is a brief overview of operating the CX-3
®
.
(A)
Use the depth control wheel to
raise the blade clear of the floor.
(B)
Attach the cooling supply hose
to the Cooling Inlet.
(C)
Lower the Pointer. Using a
Straightedge, align the Pointer to
the Blade by bending the pointer.
(D)
Layout and mark the area to
be cut using a chalk-line. Align
Pointer and Blade to chalk-line.
(E)
Start the CX-3
®
using the Engine
Start procedure in the engine
manual.
(F)
With the engine running adjust
the throttle approximately half-
way.
(G)
Open Cooling Supply Valve. Ver-
ify proper cooling flow and adjust
the water flow on the Blade to a
desired amount.
(H)
Adjust the throttle as needed to
make the cut. Slowly lower the
Blade until the desired level is
reached and begin the cut.
(I)
Perform the cut using only enough
pressure to follow the original
marked line. Do not attempt to
steer the saw. When the cut is
complete, raise the Blade. Close
Cooling Supply Valve.
Summary of Contents for MK CX-3
Page 35: ...35 NOTES...