3-49
Outside dimensions/Installation dimensions
3 Controller
(2) Robot CPU Unit installation dimensions
Because to improve ventilation and to make unit replacement easy, please secure the following distance
between the upper and lower sides of the unit and the structure, etc.
Fig.3-14 : Installation of robot CPU Unit
40mm以上
5mm以上
5mm以上
100mm以上
盤の天井、配線ダクト部分の位置
盤
扉
ロボットCPUユニット
100mm以上
123.5mm
ベースユニット
I/ O11
I/O11
Q312DB
QX40
0 1 2 3 4 5 6 7
8 9 A B C D E F
SY.ENC1
Q172DEX
Q172DEX
2
1
TREN
SY.ENC
2
1
Q173DPX
PULSER
Q173DPX
PLS.A
3
2
1
PLS.B
3
2
1
TREN
3
2
1
MELSEC
Q61P
POWER
PULL
Q03DCPU
USER
MODE
RUN
ERR.
BAT.
BOOT
PULL
USB
RS-232
QX40
0 1 2 3 4 5 6 7
8 9 A B C D E F
<Q172DRCPU>
8
4
0
C
0
8
C
4
BA T
FR O N T
C
N
2
CN1
EM I
CAUTION
STOP
RUN
1
2
SW
Q 172D RCPU
A C FA IL
RIO
M PG
TU
I/F
DISP
LAY
I/F
ロボットCPUユニット
The position of the ceiling of the
board, and the wiring duct section
Base unit
Robot CPU Unit
Robot CPU Unit
Board
Door
Within 5mm
Within 5mm
Within 100mm
Within 40mm
Within 100mm
123.5mm
Summary of Contents for MELFA SQ Series
Page 2: ......
Page 110: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 135: ......
Page 136: ......
Page 137: ......