16 - 1
9
UTILIT
Y
FUNCTION
10
C
O
MMUNICA
TION
INT
E
RF
A
C
E
SETTI
NG
11
DISP
LA
Y AND
OPE
R
A
T
IO
N
SETTIN
G
S
12
CLOCK
SE
T
T
IN
GS
AND
BA
TTER
Y
ST
A
T
US
DI
SPL
A
Y
13
FIL
E
D
ISP
LA
Y AND
COP
Y
14
G
O
T SE
L
F
C
H
EC
K
15
CLE
A
NING OF
DISPL
A
Y
S
E
CTION
16
IN
ST
AL
LA
TI
ON
O
F
BOO
TOS
AN
D
ST
ANDA
RD MONI
TO
R O
S
16. INSTALLATION OF CoreOS, BOOTOS
AND STANDARD MONITOR OS
To execute the GOT utility, BootOS or Standard monitor OS has to be installed in the C drive (Flash
memory).
This chapter explains the installation using GOT.
For details of the installation using GT Designer2, refer to the following.
GT Designer2 Version Basic Operation/Data Transmission Manual
(8. TRANSFERRING DATA)
CoreOS
Section 16.1 to 16.4 of this chapter describes BootOS and Standard monitor OS
only.
For CoreOS, refer to the following.
GRAPHIC OPERATION TERMINAL
GOT
1000
MITSUBISHI
When GOT is remote, installed
easily using the CF card
Install OS from GOT to GOT using
the CF card
BootOS or
standard monitor OS
installation
BootOS or
standard monitor OS
installation
CF card
GT Designer2
CF card
GOT
Write OS
file
Upload OS
file
GT Designer2 CF card GOT
GOT CF card GOT
GOT
GRAPHIC OPERATION TERMINAL
GOT
1000
MITSUBISHI
GOT
GRAPHIC OPERATION TERMINAL
GOT
1000
MITSUBISHI
Install the
CF card in GOT
Install the
CF card in GOT
Summary of Contents for GOT1000 GT11
Page 1: ......
Page 2: ......
Page 251: ...Index 2 U Utility function list 9 2 W Wiring 7 1...
Page 252: ...Index 3 MEMO...
Page 255: ......
Page 256: ......