59
CHAPTER 7 VARIOUS SETTINGS
7
7.
2 Par
a
met
e
r
S
e
ttings f
o
r CC-Link
7.2.2
Setting using the engineering tool
Follow the procedures below to set CC-Link.
1.
Writing the parameters of CC-Link remote stations using the engineering tool
Set the parameters of CC-Link remote stations by CC-Link parameter setting using the engineering tool.
(
2.
Checking the status of communications
Execute a line test in CC-Link to check the communication status. (
●
There are restrictions on the version of the bridge module to use CC-Link parameter setting using the engineering tool.
(
●
Do not power off or reset the power supply of the bridge module during parameter writing. Doing so may delete the
parameters set in the bridge module.
●
During parameter writing, the transmission delay time may extend (3s maximum) or data link may stop.
(1) Writing the parameters of CC-Link remote stations
The parameters of the CC-Link remote station can be set from the engineering tool by connecting the
engineering tool to the master station connected to the bridge module.
Master/local module
Engineering tool
Bridge module
CC-Link IE Field Network
Startup mode switch
Set the startup mode
switch to PRM.
Target CC-Link remote
stations of parameter
settings
Remote I/O station Remote I/O station Remote device station
Remote I/O station Remote device station
CC-Link
CC-Link IE Field Network slave stations
Summary of Contents for NZ2GF-CCB
Page 1: ...CC Link IE Field Network CC Link Bridge Module User s Manual NZ2GF CCB ...
Page 2: ......
Page 9: ...7 Memo ...
Page 35: ...33 CHAPTER 4 THE PROCEDURE BEFORE OPERATION 4 Memo ...
Page 145: ...I 4 4 7 8 143 Memo ...
Page 149: ......