95
12-3. MXZ-4B80VA MXZ-5B100VA
NOTE
: Turn OFF power supply before disassembly.
OPERATING PROCEDURE
PHOTOS
1. Removing the compressor
(1) Remove the screws of the top panel, and remove the top
panel.
(2) Remove the screws of the service panel, and remove the
service panel.
(3) Recover gas from the refrigerant circuit.
NOTE:
Recover gas from the pipes until the pressure gauge
shows 0 kg/cm
2
(0 MPa).
(4) Remove the screws of the front panel, and remove the front
panel.
(5) Remove the screws of the rear panel, and remove the rear
panel.
(6) Disconnect the compressor lead wire from terminal of
compressor (U, V, W).
(7) Disconnect the outdoor electronic control P.C. board
connectors:
CN661, CN663, CN681, CN791, CN792, CN793, CN794,
CN795 (
MXZ-5B100VA
), CN796, CN931, CN932
Disconnect the noise filter P.C. board connector:
CN912
(8) Remove the screws of the electrical parts, and remove the
electrical parts.
(9) Remove the propeller.
(10) Remove the screws of the separator, and remove the
separator.
(11) Remove the sound proof felt.
(12) Detach the brazed parts of the compressor suction and
discharge pipes (Photo 4).
(13) Remove the compressor nuts and remove the compressor.
Photo 1
Screws of
the service
panel
Screws of the front panel
Screws of the top panel
Screws of
the side panel
Screws of the
service panel
Screws of the top panel
Photo 2
Screws of
the rear panel
OBH554D
Summary of Contents for MXZ-2B30VA
Page 19: ...19 WIRING DIAGRAM 6 MXZ 2B30VA MXZ 2B40VA MXZ 2B52VA TB3 TB2 TB1 OBH554D ...
Page 20: ...20 MXZ 3B54VA OBH554D ...
Page 21: ...21 MXZ 3B68VA OBH554D ...
Page 22: ...22 MXZ 4B71VA OBH554D ...
Page 23: ...23 MXZ 4B80VA OBH554D ...
Page 24: ...24 MXZ 5B100VA OBH554D ...