OPERATING PROCEDURE
PHOTOS
2. Removing the inverter assembly, inverter P.C. board
(1) Remove the cabinet and panels. (Refer to 1.)
(2) Disconnect the lead wire to the reactor and the following con-
nectors:
<Inverter P.C. board>
CN602 (R.V. coil)
CN671 (Defrost thermistor, discharge temperature thermistor
and outdoor heat exchanger temperature thermistor)
CN672 (Ambient temperature thermistor)
CN724 (LEV)
CN931, CN932 (Fan motor)
(3) Remove the compressor connector.
(4) Remove the screws fixing the relay panel.
(5) Remove the relay panel.
(6) Remove the ground wires and the lead wires of the inverter
P.C. board.
(7) Remove the screw of the PB support.
(8) Remove the inverter P.C. board from the relay panel.
Photo 4
3. Removing R.V. coil
(1) Remove the cabinet and panels. (Refer to 1.)
(2) Disconnect the following connector:
<Inverter P.C. board>
CN602 (R.V. coil)
(3) Remove the R.V. coil.
Photo 5
59
Screws of the
PB support
Screws of the
relay panel
Inverter P.C.
board
Ground wires
Screw of the
relay panel
Screws
of the PB
support
Brazed parts of
4-way valve
Screw of the
R.V. coil
OBH686
Summary of Contents for MUZ-HE09NA
Page 10: ...10 MUZ HE09NA MUZ HE12NA 5 WIRING DIAGRAM MUZ HE15NA OBH686 ...
Page 11: ...11 MUZ HE18NA OBH686 ...
Page 12: ...12 MUZ HE24NA OBH686 ...
Page 61: ...61 OBH686 ...