13-1. MUZ-EF25VG
MUZ-EF35VG
MUZ-EF42VG
MUZ-EF25VGH
MUZ-EF35VGH
NOTE
: Turn OFF the power supply before disassembly.
Photos:
MUZ-EF42VG
OPERATING PROCEDURE
PHOTOS/FIGURES
1. Removing the cabinet
(1) Remove the screw fixing the service panel.
(2) Pull down the service panel and remove it.
(3) Disconnect the power supply cord and indoor/outdoor
connecting wire.
(4) Remove the screws fixing the top panel.
(5) Remove the top panel.
(6) Remove the screws fixing the cabinet.
(7) Remove the cabinet.
(8) Remove the screws fixing the back panel.
(9) Remove the back panel.
Photo 3
Photo 1
Photo 2
50
(1) Slide the sleeve and check if there is a locking lever or not.
(2) The terminal with this connector shown below has the
locking mechanism.
Slide the sleeve.
Pull the terminal while
pushing the locking
lever.
Hold the sleeve, and
pull out the terminal
slowly.
Connector
Sleeve
Locking lever
<Detaching method of the terminal with locking mechanism >
The terminal which has the locking mechanism can be detached as shown below.
There are 2 types of the terminals with locking mechanism.
The terminal without locking mechanism can be detached by pulling it out.
Check the shape of the terminal before detaching.
DISASSEMBLY INSTRUCTIONS
13
Back panel
Service panel
Screws of the top panel
Screws of the terminal block support and the back panel
Screws of the cabinet
Screws of
the back panel
Screws of
the top panel
Direction to
remove
Screws of the cabinet
Hooks of
the service
panel
Screw of the cabinet
Screw of
the service
panel
: Indicates the visible parts in the photos/
figures.
: Indicates the invisible parts in the photos/
figures.
OBH832