2
1
TECHNICAL CHANGES
MSZ-A09YV -
➔
MSZ-GA22VA -
MSZ-A09YV -
➔
MSZ-GA25VA -
MSZ-A12YV -
➔
MSZ-GA35VA -
E1
E1
E1
E1
E1
E1
1. Indication of capacity has been changed.(BTU base
➔
kW base)
2. Control method between indoor and outdoor has been changed.
3. Power supply method has been changed (change to supply from outdoor unit).
4. Power supply cord has been removed.
5. Indoor electronic control P.C. board has been changed.
6. Position of terminal block has been changed.
7. Indoor fan motor has been changed. ( AC
➔
DC)
8. Indoor heat exchanger has been changed.
9. The horizontal vane motor unit has been changed.
An external gear is added to the generalized stepping motor.
The unit is structured so that the driving torque and stopping torque would increase.
NOTE: Do not remove the vane motor from the motor unit.
Do not disassemble the horizontal vane motor unit.
Generalized stepping motor
10. Air cleaning filer has been removed (available as an optional part).
11. Signal of remote controller has been changed. ( It is not available for the conventional models.)
12. Symbol on terminal block has been changed (to S1/S2/S3).
OB378_--1qxp 05.1.17 12:55 Page 2
Mitsubishi ilmalämpöpumput huoltaa ja korjaa Jäähdytinpalvelu RefGroup Oy
www.ilmalämpöpumput.com