20
OPERATING PROCEDURE
PHOTOS
Photo 5
Photo 7
Screws of the
left side of the
heat exchanger
Photo 6
Hooks of the
motor band
Hexagon socket set screw
Screw of
the lead
cover
5. Removing the indoor fan motor and the line flow fan
(1) Remove the panel. (Refer to 1.)
(2) Remove the electrical box. (Refer to 3.)
(3) Pull out the drain hose from the nozzle assembly, and
remove the nozzle assembly. (Refer to 4.)
(4) Remove the screw of the lead cover and lead cover.
(5) Release the hooks to open the motor band slightly.
(6) Loosen the hexagon socket set screw from the line flow
fan.
(7) Remove the screws fixing the motor bed, and remove the
fan motor with motor band and the motor bed.
(8) Remove the screws fixing the left side of the heat
exchanger.
(9) Lift the left side of the heat exchanger.
(10) Remove the line flow fan.
Screws of
the motor
bed
3. Removing the electrical box
(1) Remove the panel. (Refer to 1.)
(2) Remove the electrical cover. (Refer to 2.)
(3) Remove the V.A. clamp. (Refer to 2.)
(4) Remove the cord clamp. (Refer to 2.)
(5) Remove the terminal block. (Refer to 2.)
(6) Remove the screw of ground wire. (Refer to 2.)
(7) Disconnect the connector of the indoor coil thermistor
(CN112), the fan motor connector (CN211 and CN121) and
the vane motor connector (CN151)on the electronic control
P.C. board.
(8) Remove the fan motor lead wire and indoor coil thermistor
from the electrical box.
(9) Remove the lead wire of vane motor from the bottom of
electrical box.
(10) Remove the screw fixing the electrical box, remove the
electrical box.
Photo 3
Indoor coil thermistor
connector
Fan motor connectors
Vane motor
connector
Screw of the
electrical box
Photo 4
Drain hose
Screws of the vane motor
4. Removing the nozzle assembly and the vane motor
(1) Remove the panel. (Refer to 1.)
(2) Remove the electrical box. (Refer to 3.)
(3) Pull out the drain hose from the nozzle assembly, remove
the nozzle assembly.
(4) Remove the screws of the vane motor, disconnect the
vane motor connector.
(5) Remove the vane motor.