![Mitsubishi Electric MS-07NV - E2 (WH) Service Manual Download Page 50](http://html.mh-extra.com/html/mitsubishi-electric/ms-07nv-e2-wh/ms-07nv-e2-wh_service-manual_1810340050.webp)
50
OPERATING PROCEDURE
PHOTOS
3. Removing the compressor
(1) Remove the lead clamps.
(2) Remove the screws fixing the relay panel.
(3) Remove the screw fixing the service port.
(4) Remove the terminal cover.
(5) Pull out the lead from the compressor terminal.
(6) Remove the overcurrent relay.
(7) Remove the compressor nuts.
(8) Detach the suction pipe welded section and discharge pipe
welded section with a burner.
NOTE
●
Before using a burner, purge gas from the pipes until the pres-
sure gauge shows 0 kg/cm
2
.
●
Use the burner under the condition that gas can be released
even when the inner pressure rises by heat.
Photo 4
Terminal cover
Discharge pipe
compressor
Suction pipe
OB206t-2.qxp 25/9/97 8:41 PM Page 50