Mitsubishi Electric MELPRO MOV-A3V-R Instruction Manual Download Page 11

11

                                     

   

JEP0-IL9557

 

 

A relay test is carried out sufficiently before shipment, 

but  at  the  following  cases,  it  is  recommended  the  test 

should be carried out again. 

a.

 

When the products are delivered and unpacked 

b.

 

At the time of starting operation of equipment 

c.

 

At  the  time  of  periodic  inspection  (Usually  once  a 

year) 

 

1.  At the time of testing

 

The  input  waveform  should  be  a  sine  wave  with  little 

distortion. 

During  the  test,  set  the  position  of  the  indicator 

select  switch  to  "V  MEASURE".  Set  the  other  setting 

switches  according  to  the  test  conditions  of  the 

operating characteristic control point. 

If  user-defined  control  point  is  specified  (e.g. 

accuracy  of  relay  characteristic  is  controlled  at 

service  conditions),  execute  the  test  at  the 

manufacturer-defined  characteristic  control  point 

before in-service operation and then check accuracy of 

the  relay.  After  that,  execute  the  test  at  the  user-

defined  control  point,  and  use  this  data  as  a  later 

reference. 

 

2.  Withstand voltage test

 

a.  Apply  2000V  AC  (commercial  frequency)  between  all 

circuits and external box (fixing screw for mounting) 

for one minute, and make sure that there is no problem. 

Voltage applied terminals 

 

 

External box 

(Fixing screw for 

mounting) 

 

b.  Apply 2000V AC (commercial frequency) between separate 

circuits for one minute, and make sure that there is 

no problem. 

Voltage applied terminals 

 

 

 

3.  Operation characteristics test 

When the rated voltage is applied, the RUN display LED 

(green) lights up. This indicates that the relay works 

properly. 

When  adjusting  the  test  voltage  during  the  operating 

time  test,  it  is  recommended  to  press  the  CPU  reset 

button  to  lock  the  operation  of  this  relay.  If  the 

operation is locked and the test voltage is adjusted, 

an accurate test is possible. 

By  turning  the  indicator  select  switch  to  "TEST"  and 

pushing  "TEST"  button  for  2  seconds  or  more,  output 

contact can be forced to operate (except for the case 

of LOCK setting). 

 

4.  Operation characteristic control point 

Perform the test periodically according to the following 

test conditions and criteria. 

Test item 

Test condition 

Criteria 

Input 

Operation 

value 

Operating 

time 

Operation 

value 

Each 

setting 

Minimum 
setting 

±

5% of 

setting value 

Reset 
value 

Minimum 
setting 

Minimum 
setting 

95% or more 

of operating 

value 

Operating 

time 

0V 

 

120% of 
setting 

Minimum 
setting 

0.1

0.2s 

setting 

±

50ms of 

setting time 

Minimum 
setting 

0.5s or 

more 

±

10% of 

setting time 

 

 

 

 

 

 

 

Test 

P1 

P2 

a22 

a21 

a11 

P1 

P2 

a11 

a21  a22 

a12 

a12 

Summary of Contents for MELPRO MOV-A3V-R

Page 1: ...1 JEP0 IL9557 Request Ensure that this Instruction Manual is delivered to the end users and the maintenance manager ...

Page 2: ...t Failure to do so may lead to the risk of electric shock equipment failure malfunction or failure to operate Ensure that the equipment is connected correctly in accordance with the details e g polarity or phase sequence shown on the connection terminals Otherwise there is the risk of failure burning malfunction or maloperation All power supplies and transformers to the equipment must be of suitab...

Page 3: ...el Otherwise there are risks of electric shock injury failure malfunction and maloperation Handling and maintenance of the equipment must only be carried out after gaining a thorough understanding of the instruction manual Otherwise there is the risk of electric shock injury failure malfunction or maloperation When replacing the equipment use a product of same model rating and specifications Other...

Page 4: ... special damages and secondary damages whether foreseeable or not compensation for accidents and compensation for damages to products other than MITSUBISHI ELECTRIC CORPORATION products and other tasks 4 Applications of products 1 The user is requested to confirm the standards the regulations and the restrictions which should be applied in case of utilizing this product and another one in combinat...

Page 5: ...ecommended to replace 2 Product supply including repair parts is not available after production is discontinued 6 Changes in product specification The specification given in the catalogue manuals or technical documents are subject to change without prior notice 7 Scope of service The technical service fee such as engineer dispatching fee is excluded in the price of our products Please contact to o...

Page 6: ...0 5 0s Frequency 50Hz SW1 ON 60Hz SW1 OFF Display Self monitoring The RUN indicator green color is lighted in normal condition Operation indicator The indicator turns from black into orange color when the protection element is put into operation Manual resetting type Numerical display 1 Lo means LOCK setting the protection element is locked Indication item Range Voltage measurement 80 160V Pickup ...

Page 7: ...m Input 0V 165V for 10s Criteria The relay shall operate Vibration Frequency Hz Peak to peak amplitude mm Acceleration m s2 Vibration time s Setting Minimum operation value and minimum operating time Input 90 of setting value Criteria No malfunction and no abnormal indication Forward backward Right left Up down 10 5 10 2 5 5 30 16 7 0 4 2 600 Shock Maximum acceleration 300m s2 Direction 3 directio...

Page 8: ...p When input voltage is greater than or equal to the setting value U is displayed This function can be used for operation value tests CPU reset button While this button is pressed the relay function is locked and the RUN indicated LED is turned off RUN indicated LED Green It shows the result of self monitoring It lights up in normal condition Setting switches for operation value and time Set the s...

Page 9: ...after the relay operation Clearing of fault records Set indicator select switch to CLEAR FAULT REC and hold for 5s or more then O K is displayed and all of the fault record are cleared 5 Display function of setting change When a setting is changed the setting value after changing is displayed for approx 3s preferentially 6 Detection function of frequency difference If there is a difference between...

Page 10: ...conditions Please refrain from changing the setting value during operation since unwanted operation may occur However if the setting change is unavoidable please press the CPU reset button in order to lock the relay function Don t leave rotary switches with halfway indefinite state The RUN LED lights up in the normal condition when the rated voltage is input If it still turns off when the input vo...

Page 11: ...there is no problem Voltage applied terminals External box Fixing screw for mounting b Apply 2000V AC commercial frequency between separate circuits for one minute and make sure that there is no problem Voltage applied terminals 3 Operation characteristics test When the rated voltage is applied the RUN display LED green lights up This indicates that the relay works properly When adjusting the test...

Page 12: ...the electrical circuit e g substrate capacitor and transformer and be sure to hold the drawer handle or the frame part when transporting Touching the electrical circuit may cause electric shock or damage to the circuit Before the subunit is to be drawn out ensure that the following items are checked in order not to carry out the work in hot line condition Lock of the tripping circuit Turning off t...

Page 13: ...the subunit with your finger hooked on the drawer handle on both sides Support the frame of subunit and pull out 2 Procedure of housing Drawer fixing screw Support the frame of subunit and place the subunit in the case along the rails Insert the subunit into the case horizontally Open the cover and tighten the drawer fixing screw Cover Cover ...

Page 14: ...up the upper side of the cover from the inner surface Then remove from the protrusion of the body Installing the cover As shown in Fig 5 7 mount the holes on the upper side of the cover to the protrusion of the body Then press down lightly on the lower side of the cover and mount to the protrusion of the body in the same way as above When replacing the cover during operation be careful not to touc...

Page 15: ...ed to the protection relay have limited lifetime which will bring the degradation to the relay The degree of degradation will be variable depending on the purpose aging usage environment and unevenness on the performance of each part Our company designs its products so that the recommended renewal period is 15 years or more However there may be some possibilities to occur any failures before reach...

Page 16: ...HEAD OFFICE 7 3 MARUNOUCHI 2 CHOME CHIYODA KU TOKYO 100 8310 JAPAN First edition Jan 2021 ...

Reviews: