19 - 10
19. ENERGY MEASURING UNIT/ELECTRIC MULTI-MEASURING INSTRUMENT CONNECTION
19.5 Setting of Energy Measuring Unit/Electric Multi-measuring Instrument
19.5 Setting of Energy Measuring Unit/
Electric Multi-measuring Instrument
POINT
POINT
POINT
Energy measuring unit/electric multi-measuring
instrument
For details of the energy measuring unit/electronic
multi-measuring instrument, refer to the following
manual.
Energy measuring unit/Electronic multi-
measuring instrument User's Manual
19.5.1 Connecting to an energy
measuring unit/electronic
multi-measuring instrument
Communication settings
Make the communication settings with the front
operation switch on the energy measuring unit/
electronic multi-measuring instrument.
*1
Indicates only the transmission speeds that can be set on
the GOT side.
*2
Adjust the settings with GOT settings.
19.5.2 Station number setting
In the MODBUS network, a maximum of 31 energy
measuring units/electronic multi-measuring instruments
can be connected to 1 GOT.
Assign a non-overlapped station number ranging from 1 to
247 arbitrarily to each energy measuring unit/electronic
multi-measuring instrument.
In the system configuration, the energy measuring unit/
electric multi-measuring instrument with the station number
set with the host address must be included. The station
number can be set without regard to the cable connection
order. There is no problem even if station numbers are not
consecutive.
Series
Model name
Refer to
Energy measuring unit
EMU4-BD1-MB
EMU4-HD1-MB
Electric multi-measuring instrument
ME110SSR-MB
ME96NSR-MB
Item
Set value
Transmission speed
*1*2
9600bps, 19200bps, 38400bps
Data Bit
8bits (Fixed)
Stop Bit
*2
1bit, 2bits
(Default: 1bit)
Parity
*2
NONE/EVEN/ODD
(Default: EVEN)
Device address
*2
1 to 247
(Default: 1)
Examples of station number setting
Station
No.3
Station
No.15
Station
No.1
GOT
Summary of Contents for GT15
Page 2: ......
Page 34: ...A 32 ...
Page 92: ......
Page 110: ...2 18 2 DEVICE RANGE THAT CAN BE SET 2 9 MELSEC WS ...
Page 186: ...5 10 5 BUS CONNECTION 5 2 System Configuration ...
Page 218: ...5 42 5 BUS CONNECTION 5 4 Precautions ...
Page 254: ...6 36 6 DIRECT CONNECTION TO CPU 6 6 Precautions ...
Page 286: ...7 32 7 COMPUTER LINK CONNECTION 7 6 Precautions ...
Page 350: ...8 64 8 ETHERNET CONNECTION 8 5 Precautions ...
Page 368: ...9 18 9 MELSECNET H CONNECTION PLC TO PLC NETWORK 9 5 Precautions ...
Page 420: ...11 26 11 CC Link IE CONTROLLER NETWORK CONNECTION 11 5 Precautions ...
Page 440: ...12 20 12 CC Link IE FIELD NETWORK CONNECTION 12 5 Precautions ...
Page 490: ...13 50 13 CC Link CONNECTION INTELLIGENT DEVICE STATION 13 5 Precautions ...
Page 510: ......
Page 564: ...15 54 15 INVERTER CONNECTION 15 7 Precautions ...
Page 668: ......
Page 712: ...21 12 21 MULTIPLE GT14 GT12 GT11 GT10 CONNECTION FUNCTION 21 5 Precautions ...
Page 713: ...MULTI CHANNEL FUNCTION 22 MULTI CHANNEL FUNCTION 22 1 ...
Page 714: ......
Page 760: ...22 46 22 MULTI CHANNEL FUNCTION 22 5 Multi channel Function Check Sheet ...
Page 761: ...FA TRANSPARENT FUNCTION 23 FA TRANSPARENT FUNCTION 23 1 ...
Page 762: ......
Page 860: ...REVISIONS 4 ...
Page 863: ......