17 - 6
17. ROBOT CONTROLLER CONNECTION
17.4 PLC Side Settings
17.4 PLC Side Settings
17.4.1 Connecting to robot controller
(CRnD-700)
This section describes the settings of a GOT and a robot
controller in the following case of system configuration.
POINT
POINT
POINT
Robot controller (CRnD-700)
For details of the robot controller (CRnD-700), refer to
the following manual.
CRnD-700 SET UP MANUAL
System configuration
Parameter settings for CRnD-700
(1) For RT ToolBox2
: Necessary : As necessary : Not necessary
(2) For R32TB or R56TB
(For R56TB)
: Necessary : As necessary : Not necessary
[Controller Setting] and [Ethernet] of GT
Designer3
(1) Communication settings
(2) Ethernet setting
Model
Reference
Robot controller
CRnD-700
Item
Set value
Setting necessity at
GOT connection
NETIP
192.168.0.19
GOTPORT
5001
<GOT> (The settings other than the
following are set to the default)
Network No.
: 1
PLC No.
: 1
IP address
: 192.168.0.18
Port No.
: 5001
Communication format : UDP (fixed)
Network No.
: 1
PLC No.
: 2
IP address
: 192.168.0.19
Port No.
: 5001
Communication format
: UDP(fixed)
<CRnD-700> (The settings other than the
following are set to the default)
■
Parameter settings for CRnD-700
■
[Controller Setting] and [Ethernet] of GT
Item
Set value
Setting
necessity at
GOT
connection
NETIP
192.168.0.19
GOTPORT
5001
Item
Set value
GOT NET No.
1
GOT PLC No.
1
GOT IP Address
192.168.0.18
GOT Port No. (Communication)
5001
GOT Port No.
(Ethernet Download)
5014
Default Gateway
0.0.0.0
Subnet Mask
255.255.255.0
Retry
3times
Startup Time
3sec
Timeout Time
3sec
Delay Time
0ms
Item
Set value
Ethernet setting
No.1
Host
*
N/W No.
1
PLC No.
2
Type
CRnD-700
IP address
192.168.0.19
Port No.
5001 (fixed)
Communication
UDP (fixed)
Summary of Contents for GT15
Page 2: ......
Page 34: ...A 32 ...
Page 92: ......
Page 110: ...2 18 2 DEVICE RANGE THAT CAN BE SET 2 9 MELSEC WS ...
Page 186: ...5 10 5 BUS CONNECTION 5 2 System Configuration ...
Page 218: ...5 42 5 BUS CONNECTION 5 4 Precautions ...
Page 254: ...6 36 6 DIRECT CONNECTION TO CPU 6 6 Precautions ...
Page 286: ...7 32 7 COMPUTER LINK CONNECTION 7 6 Precautions ...
Page 350: ...8 64 8 ETHERNET CONNECTION 8 5 Precautions ...
Page 368: ...9 18 9 MELSECNET H CONNECTION PLC TO PLC NETWORK 9 5 Precautions ...
Page 420: ...11 26 11 CC Link IE CONTROLLER NETWORK CONNECTION 11 5 Precautions ...
Page 440: ...12 20 12 CC Link IE FIELD NETWORK CONNECTION 12 5 Precautions ...
Page 490: ...13 50 13 CC Link CONNECTION INTELLIGENT DEVICE STATION 13 5 Precautions ...
Page 510: ......
Page 564: ...15 54 15 INVERTER CONNECTION 15 7 Precautions ...
Page 668: ......
Page 712: ...21 12 21 MULTIPLE GT14 GT12 GT11 GT10 CONNECTION FUNCTION 21 5 Precautions ...
Page 713: ...MULTI CHANNEL FUNCTION 22 MULTI CHANNEL FUNCTION 22 1 ...
Page 714: ......
Page 760: ...22 46 22 MULTI CHANNEL FUNCTION 22 5 Multi channel Function Check Sheet ...
Page 761: ...FA TRANSPARENT FUNCTION 23 FA TRANSPARENT FUNCTION 23 1 ...
Page 762: ......
Page 860: ...REVISIONS 4 ...
Page 863: ......