DISASSEMBLY PROCEDURE
PHOTOS
Photo 3-3
3. How to remove the electrical parts
(Steps (1) through (3) are applied to all the following parts.)
(1) Remove the front panel. (Refer to Procedure 1).
(2) Remove the 4 screws holding the control box cover.
(Photo 3-1)
(3) Slightly lift and pull out the control box cover. (Photo 3-1)
<Earth leakage circuit breaker> (Photo 3-2)
(4) Disconnect all the lead wires from the earth leakage cir-
cuit breaker.
(5) Remove the 2 screws on the earth leakage circuit break-
er.
Note: To avoid dropping of the breaker, hold the breaker by
hand when removing the last screws.
<Contactor>
(Photo 3-2)
(4) Disconnect all the lead wires from the contactors.
(5) Remove the 2 screws on each contactor.
Note:
To avoid dropping of the contactors, hold the contactors
by hand when removing the last screws.
To prevent an electrical shock, wait until all the LED
lamps on the FTC4 control board are turned off.
<Terminal block> (Photo 3-2)
(4) Disconnect all the lead wires from the terminal block. (To
disconnect the S1, S2 and S3 lead wires, disengage the
locks by pressing on the claws.)
(5) Remove the screw on the terminal block.
Note: To avoid dropping of the terminal block, hold the termi-
nal block by hand when removing the screw .
<Controller board> (Photo 3-3)
(4) Disconnect all the lead wires from the controller board.
(5) Remove the controller board from the 6 board supports.
Photo 3-2
*
The photos shown are of the EHSC model.
Terminal block (TB1)
Earth leakage circuit
breaker (ECB1)
Contactors
Control box
Controller
board
Screw
Photo 3-1
Control box cover
fixing screws
Control box cover fixing screws
Control box
cover
Controller
board
OCH532A