![Mitsubishi Electric E1070 Installation Manual Download Page 10](http://html.mh-extra.com/html/mitsubishi-electric/e1070/e1070_installation-manual_238475010.webp)
Installation
10
Mitsubishi Electric, MA00776C
3. Secure the operator panel in position, using all the fastening holes and the
provided brackets and screws:
4. Connect the cables in the specified order.
Use an M5 screw and a grounding conductor (as short as possible)
with a cross-section of minimum 2.5 mm
2
.
5. Carefully remove the laminated film over the operator panel display, to avoid
static electricity that could damage the panel.
x 6
0.5 - 1.0 Nm
B
C
D
A
Caution
Ensure that the operator panel and the controller system have the
same electrical grounding (reference voltage level), otherwise errors
in communication may occur.
Caution
- Use only shielded communication cables.
- Separate high voltage cables from signal and supply cables.
Caution
- The operator panel must be brought to ambient temperature
before it is started up. If condensation forms, ensure that the
operator panel is dry before connecting it to the power outlet.
- Ensure that the voltage and polarity of the power source is correct.
24V DC
RS422/RS485
24V DC
1
CF
CARD
B
A
C
D
RS232
Controller
Power
Ethernet
Summary of Contents for E1070
Page 1: ...MITSUBISHI ELECTRIC E1070 Installation manual MA00776C 2008 07 English ...
Page 4: ...Table of Contents Mitsubishi Electric MA00776C ...
Page 8: ...Safety Precautions 8 Mitsubishi Electric MA00776C ...
Page 12: ...Installation 12 Mitsubishi Electric MA00776C ...
Page 14: ...Technical Data 14 Mitsubishi Electric MA00776C ...
Page 20: ...Operator Panel Drawings 20 Mitsubishi Electric MA00776C ...