8-89
8-89
8.15. Copying Programs Between Projects
Use program management to copy or move a created robot program to another project. For details on the operation
method, see
,
, or
It is possible to copy by drag and drop the project name in the project tree.
Please refer to
in this manual for details.
It is possible to change the display order
of the projects in the tree.
It is possible to change the display order of the projects in the tree.
Drag the project with the mouse, and drop it at the transportation destination. The project will
move to the top of the dropped project.
Memo
Drag and drop
Summary of Contents for 3F-14C-WINE
Page 84: ...8 84 8 84 Figure 8 21 Parameter transfer procedure 1 2 2 ...
Page 393: ...18 393 18 393 Figure 18 1 Starting the Oscillograph ...
Page 413: ...18 413 18 413 Figure 18 24 Output to Robot program Selection ...
Page 464: ...18 464 18 464 Figure 18 72 Starting the Tool automatic calculation ...
Page 545: ...21 545 21 545 Figure 21 55 Hide display of user mechanism ...
Page 624: ...24 624 24 624 Figure 24 4 Document output example ...