Installation
93
Mitel SMB Controller
syd-0657/2.0 – R6.0 – 09.2018
Fig. 15
Drilling template
4. 2. 5. 4
Wall-mounting procedure
Materials required:
• Screw set for wall/desktop installation
• 6 mm drill
• Screwdriver
To mount the communication server to the wall, proceed as follows:
1. Using the drill template or the instructions on the drill plan to mark out the three drill
holes. Make sure you observe the minimum distances to other objects, walls or ceil-
ings as shown in Fig. 12 and Fig. 13.
2. Drill the three dowel holes.
3. Insert the dowel plugs.
"
#
$