PAGE 6
FAUCET INSTALLATION ON THE BATHTUB (OPTIONAL)
4” [100]
4” [100]
11
/16” [17]
2” [50]
Measures: inch [millimeter]
Zone for deck Mounted faucet
11/16” [17]
2” [50]
4” [100]
4” [100]
25 9/16” [650]
19 1
1
/16” [500]
1.
Locate where you will drill the holes into the acrylic, and stick masking tape onto that area. This will
prevent the acrylic from chipping and protect the finish from scratches.
2.
Drill holes for the faucets on the bathtub at the desired location.
3.
Unscrew the bolts at the bottom of the the bathtub using an adjustable wrench. Then carefully take
out the top of the tub and place it on a throw rug or other protective floor covering to prevent damage
to the bathtub and floor.
4.
Install the faucets according to the faucet manufacturer’s instructions. Then assemble the top of
the bathtub with the skirt, and secure the bolts at the bottom as shown in the illustration.
5.
Connect the faucet supply lines with hot and cold water supply and check for leaks.
Notes: Verify all pipe connections to ensure no leakage occurs.