![Mirolin BEACON 1 Installation Instructions Manual Download Page 3](http://html1.mh-extra.com/html/mirolin/beacon-1/beacon-1_installation-instructions-manual_1806094003.webp)
3
STEP 1: Unpack carton, leave
protective
as much of the
film on the acrylic
installation
tub as possible until the
finishes to minimize marking of the tub during installation.
STEP 5: Install faucet on the tub deck if required.
STEP 4: Separate
pull apart
bathing well from the apron;
bathing well from the apron section as shown.
STEP 2: Position the tub in the area where it will be
installed. Unscrew the drain pop-up and mark drain
location.
MARK DRAIN LOCATION
STEP 6:
ssemble bathing well with apron
Rea
ensuring the
apron cut out is on the waste and overflow side and
replace the screws as shown in step 3.
STEP 3: To disassemble the bathing well from the apron
of the
vert
a screw driver or drill
bathtub, in
the tub. Using
,
remove the
.
4 screws holding the 2 tub pieces together
SCREW
S
LOCATION
WASTE &
OVERFLOW
CUT OUT