2. Installation
Verification
9 Install the PS8100 power supply modules as follows:
a At the front of the NV8000, install
primary
PS8100 power supply modules in slots 1 and 3,
as shown in Figure 2-39.
b Optionally, install
redundant
PS8100 power supply modules in slots 2 and 4, as shown in
c Repeat this step for the other power supply.
Figure 2-39. NV8000 Power Supply (Front View)
10 Connect the
router’s
ground lug to earth ground using a copper wire from 14 to 6 AWG. The
ground lug is located in the lower right corner of the frame.
11 If you have two NV8280-Plus or NV8576-Plus frames, connect power similarly for both
frames. Four NV8000 frames are required to power two NV8280-Plus or NV8576-Plus frames.
Verification
When installation is complete, perform the following checks to make sure the router is operating
properly:
• If using an NV8000 power supply frame, check that all 5 green power LEDs on the front of
each PS8100 power supply module are lit. If any or all LEDs are off:
• Check that the PS8100 power supply module is fully seated in its slot.
• Check for +48 volts at each of the 5 front test points.
• On the router frame, check that the LEDs on the input cards, crosspoint cards, control cards,
and output cards are lit and indicating a “healthy” system. See
on page 101 for
a list of normal and alert LED states.
• Make sure that the flow of air through the front of the router is unimpeded and the door is prop-
erly installed and closed. For more information, see
GND
PS8010
1 2 3 4 5
1 2 3 4 5
POWER
48V
+
GND
PS8010
1 2 3 4 5
1 2 3 4 5
POWER
48V
+
GND
PS8010
1 2 3 4 5
1 2 3 4 5
POWER
48V
+
GND
PS8010
1 2 3 4 5
1 2 3 4 5
POWER
48V
+
1 (primary)
2 (redundant)
4 (redundant)
3 (primary)
Summary of Contents for NV8144
Page 10: ...x Rev 2 2 27 Mar 10 Table of Contents ...
Page 56: ...46 Rev 2 2 27 Mar 10 1 Introduction Frame Expansion ...
Page 104: ...94 Rev 2 2 27 Mar 10 2 Installation Verification ...
Page 106: ...96 Rev 2 2 27 Mar 10 3 Configuration ...
Page 110: ...100 Rev 2 2 27 Mar 10 4 Operation Setting Redundant Crosspoint Switching ...
Page 116: ...106 Rev 2 2 27 Mar 10 5 Maintenance Obtaining Service ...
Page 124: ...114 Rev 2 2 27 Mar 10 6 Technical Details Time Code Specifications ...
Page 128: ...118 Rev 2 2 27 Mar 10 7 Part Numbers ...
Page 140: ...130 Rev 2 2 27 Mar 10 Index ...