SCALE SWING – 2 SEAT
Item Description Qty
Specifications
1
Scale Swing Overhead
1
2
Leg (Left)
1
Materials:
3
Leg (Right)
1
4
Swing Leg Spacer
1
5
Pivot Bracket
1
Colour: Optional
6
Rubber Buffer with Plate ( Pre-assembled) *
2
7
Bearing (Pre-assembled) * (Fitted)
2
Finish: Powdercoat
8
Bearing Block (Pre-assembled) * (Fitted)
2
9 Pommel
Seat
*
2
10
Chain With Pommel Seat Bracket *
2
11
Chain Cover *
2
12
M12x120mm H/T 8.8 Hex Head Bolt
8
Fasteners:
13
M12 Flat Washer
28
14
M12 Nyloc Nut
14
15
M10x30mm Hex Head Bolt
4
16
M12x130mm Hex Head Bolt
12
17
M10 Nyloc Nut
2
18
M12x70mm H/T 8.8 Bolt Z/P
2
19
8mm 'S' Hook *
2
20
M12 'D' Shackle *
2
21
M10 Flat Washer
10
Application:
Maintenance
All fasteners should be regularly checked and
retightened, if necessary, 1 week after installation.
Ongoing maintenance intervals will vary according to
the amount of use the equipment receives.
Recommend inspection intervals every 3 months.
* Wear Item - Refer Warranty
Safety Area
Installation Instructions:
1.
Dig foundation as per drawing.
2.
Attach the Pivot Bracket to the Legs as per Detail A.
3.
Attach the two Spacer to both Legs as per Details C.
4.
Slide the two Bearings and Bearing Blocks, with the holes
facing outwards, onto the Pivot Bracket as per Detail A.
5.
Stand assembles upright, position in previously dug
Foundations and concrete as per drawing. The concrete must
be left to cure for a minimum of 2 days.
6.
Once the concrete has cured, attach the as Scale Swing Seat
Assemblies per details B. Ensure S Hooks are fully closed
‘Metal t Metal” and bolts are tight prior to use.
Age Groups:
3-7 Years
7-15 Years
STRUCTURE: ____________________
DATE: ___________
MIRACLE: ______________________
DATE: ___________
Doc No. F-07